Crossref Citations
This article has been cited by the following publications. This list is generated based on data provided by Crossref.
van der Mei, R. D.
1999.
Delay in polling systems with large switch-over times.
Journal of Applied Probability,
Vol. 36,
Issue. 1,
p.
232.
van der Mei, R. D.
1999.
Delay in polling systems with large switch-over times.
Journal of Applied Probability,
Vol. 36,
Issue. 1,
p.
232.
van der Mei, R.D.
1999.
Polling systems in heavy traffic: Higher moments of the delay.
Queueing Systems,
Vol. 31,
Issue. 3-4,
p.
265.
van der Mei, R.D.
1999.
Distribution of the delay in polling systems in heavy traffic.
Performance Evaluation,
Vol. 38,
Issue. 2,
p.
133.
van der Mei, R.D.
2000.
Polling Systems with Switch-over Times under Heavy Load: Moments of the Delay.
Queueing Systems,
Vol. 36,
Issue. 4,
p.
381.
van der Mei, R. D.
2001.
POLLING SYSTEMS WITH SIMULTANEOUS BATCH ARRIVALS.
Stochastic Models,
Vol. 17,
Issue. 3,
p.
271.
Vatutin, V. A.
and
Dyakonova, E. E.
2002.
Multitype Branching Processes and Some Queueing Systems.
Journal of Mathematical Sciences,
Vol. 111,
Issue. 6,
p.
3901.
Olsen, Tava Lennon
and
van der Mei, R. D.
2003.
Polling systems with periodic server routeing in heavy traffic: distribution of the delay.
Journal of Applied Probability,
Vol. 40,
Issue. 2,
p.
305.
Vishnevskii, V. M.
and
Semenova, O. V.
2006.
Mathematical methods to study the polling systems.
Automation and Remote Control,
Vol. 67,
Issue. 2,
p.
173.
van der Mei, R.D.
and
Winands, E.M.M.
2007.
Polling models with renewal arrivals: A new method to derive heavy-traffic asymptotics.
Performance Evaluation,
Vol. 64,
Issue. 9-12,
p.
1029.
van der Mei, R. D.
and
Resing, J. A. C.
2007.
Managing Traffic Performance in Converged Networks.
Vol. 4516,
Issue. ,
p.
544.
van der Mei, R. D.
2007.
Towards a unifying theory on branching-type polling systems in heavy traffic.
Queueing Systems,
Vol. 57,
Issue. 1,
p.
29.
van der Mei, R. D.
2007.
Managing Traffic Performance in Converged Networks.
Vol. 4516,
Issue. ,
p.
556.
van der Mei, R.D.
and
Winands, E.M.M.
2008.
Heavy traffic analysis of polling models by mean value analysis.
Performance Evaluation,
Vol. 65,
Issue. 6-7,
p.
400.
