Hostname: page-component-7b7567c8c-tnkh4 Total loading time: 0 Render date: 2026-11-17T17:42:26.233Z Has data issue: false hasContentIssue false

End Game for Japan's Construction State - The Linear (Maglev) Shinkansen and Abenomics

Published online by Cambridge University Press:  14 March 2025

Rights & Permissions [Opens in a new window]

Abstract

Core share and HTML view are not available for this content. However, as you have access to this content, a full PDF is available via the 'Save PDF' action button.

Prime Minister Abe has committed 3 trillion yen ($27 billion) to finance a linear Shinkansen project linking Tokyo and Nagoya/Osaka by Maglev. Technical analysis shows that the Linear Shinkansen constitutes not only an extraordinarily costly but also an abnormally energy-wasting project, consuming in operation between four and five times as much power as the Tokaido Shinkansen which already provides high speed rail connection. Since the 1960s, Japan's major construction projects have become vastly more costly and less efficient. Deficit-breeding, energy-wasting, environmentally-destructive, and technologically unreliable, the Linear Shinkansen project must be considered a guaranteed fiasco, with the potential not only of its own collapse but of bringing the Tokaido Shinkansen down too.

Information

Type
Research Article
Creative Commons
Creative Common License - CCCreative Common License - BYCreative Common License - NCCreative Common License - ND
This is an Open Access article, distributed under the terms of the Creative Commons Attribution-NonCommercial-No Derivatives licence (http://creativecommons.org/licenses/by-nc-nd/4.0/), which permits non-commercial re-use, distribution, and reproduction in any medium, provided the original work is unaltered and is properly cited. The written permission of Cambridge University Press must be obtained for commercial re-use or in order to create a derivative work.
Copyright
Copyright © The Authors 2017