Hostname: page-component-7b7567c8c-fvjsw Total loading time: 0 Render date: 2026-11-16T00:33:43.983Z Has data issue: false hasContentIssue false

III. The Treasury and Open Contracting, 1778–1782

Published online by Cambridge University Press:  11 February 2009

Norman Baker
Affiliation:
State University of New York at Buffalo

Extract

During the War of American Independence, the Treasury Board contracted for a wide range of army supplies. Opposition, both in parliament and the press, persistendy criticized the methods employed in the allocation of contracts. It was widely believed that contracts were awarded in the interests of ministerial influence, not public economy; contractors were the friends of government and enjoyed excessive profits. The most frequendy proposed alternative was to contract through public advertisement and accept the lowest tender received. This method was normally referred to as open contracting. Isaac Barre was the main opposition spokesman on matters relating to army supplies and it was his view, expressed in the House during April 1778, that ‘contracts ought to be open, and offered to the lowest bidder'. Government spokesmen and contractors sitting in the House regularly countered this argument with the assertion that open contracts’ would be prejudicial to the public service. Men inadequate to the accomplishment of the contracts, would at all times bid lower than men of ability and reputation, and they would do much more injury by serving the public badly, than the difference of expense. 'Although neither Lord North nor John Robinson, the Treasury Secretary mainly responsible for contract business, were fully satisfied with existing contract methods, they sought economies within those methods and even the Shelburne ministry, when it radically altered the contracting system for supplying the army in America in 1782, decided against the open contracts championed by friends of Shelburne when in opposition.

Information

Type
Articles
Copyright
Copyright © Cambridge University Press 1972

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

Article purchase

Temporarily unavailable