Hostname: page-component-7b7567c8c-2n9c9 Total loading time: 0 Render date: 2026-11-17T04:40:29.497Z Has data issue: false hasContentIssue false

The control of a finite dam

Published online by Cambridge University Press:  14 July 2016

F. A. Attia*
Affiliation:
University of Kuwait
P. J. Brockwell*
Affiliation:
Colorado State University
*
∗ Postal address: Department of Mathematics, University of Kuwait, P.O. Box 5969, Kuwait. Work done while on sabbatical leave at Colorado State University.
∗∗ Postal address: Department of Statistics, Colorado State University, Fort Collins, CO 80523, U.S.A.

Abstract

The long-run average cost per unit time of operating a finite dam controlled by a PlM policy (Faddy (1974), Zuckerman (1977)) is determined when the cumulative input process is (a) a Wiener process with drift and (b) the integral of a Markov chain. It is shown how the cost for (a) can be obtained as the limit of the costs associated with a sequence of input processes of the type (b).

Information

Type
Research Papers
Copyright
Copyright © Applied Probability Trust 1982 

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

Article purchase

Temporarily unavailable