Hostname: page-component-7b7567c8c-7pwfn Total loading time: 0 Render date: 2026-11-15T16:23:02.838Z Has data issue: false hasContentIssue false

Inspection and replacement policies

Published online by Cambridge University Press:  14 July 2016

Dror Zuckerman*
Affiliation:
The Hebrew University
*
∗ Present address: Graduate School of Management, MEDS Department, Northwestern University, Evanston, Illinois 60201, U.S.A.

Abstract

In this article we examine a breakdown model in which the system's status can be determined only by a test. Upon detection of failure the system must be replaced by a new identical one. The costs incurred include cost of inspection, operating costs, failure cost and a cost associated with planned replacements. Throughout the paper we restrict attention to replacement rules in which the time interval between two successive inspections is regarded as a fixed quantity. The decision variables include the inspection interval and the scheduling for preventive (planned) replacements. The problem is to specify a replacement rule which minimizes the long-run average cost per unit time. We show that under certain monotone conditions there is a natural candidate for an optimal replacement rule.

Information

Type
Research Papers
Copyright
Copyright © Applied Probability Trust 1980 

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

Article purchase

Temporarily unavailable