Hostname: page-component-7b7567c8c-2n9c9 Total loading time: 0 Render date: 2026-11-15T06:05:29.755Z Has data issue: false hasContentIssue false

The Consent Justification for Benefit–Cost Analysis

Published online by Cambridge University Press:  06 July 2020

Richard O. Zerbe*
Affiliation:
Public Policy and Governance, University of Washington, 939, 21st Ave East, Seattle, WA 98112, USA, e-mail: richardozerbe@gmail.com
Rights & Permissions [Opens in a new window]

Abstract

This paper provides a Consent Justification for benefit–cost analysis (BCA). The Consent Justification is based on a tendency toward actual compensation. A substantial justification for using BCA as a tool is the actual Pareto test, called the Consent Justification, in combination with the net present value criterion for individual projects. The traditional justification, the potential compensation test (PCT), is unsatisfactory on several grounds. In addition, the PCT occupies the uneasy position of being the source of extended criticisms in the economic literature and especially in the legal and philosophy literature. The argument for the Consent Justification lies not only in the deficiencies of the PCT, but also, especially, in a showing through simulation that all tend to gain across a portfolio of projects which is not large but rather robust with respect to errors and assumptions.

Information

Type
Article
Copyright
© Society for Benefit-Cost Analysis, 2020
Figure 0

Table 1Tax data used to generate cost-bearing groups.

Figure 1

Figure 1Results of 1000 project portfolio simulations.

Figure 2

Table 2Mean overall proportion of individuals who end up with positive net benefits, effects of error rates.

Figure 3

Figure 2Cost allocated uniformly.

Figure 4

Figure 3Scatter plot of net overall winners by accuracy rate.

Figure 5

Figure 4Density of simulation net overall winners by accuracy rate.

Figure 6

Figure 5Portfolio simulation with nonindependent sampling weights.