Hostname: page-component-7b7567c8c-wxvwp Total loading time: 0 Render date: 2026-11-17T01:10:50.941Z Has data issue: false hasContentIssue false

Deviation of a bore hole during drilling

Published online by Cambridge University Press:  30 January 2017

T. J. O. Sanderson*
Affiliation:
British Antarctic Survey, Madingley Road, Cambridge CB3 0ET, England
Rights & Permissions [Opens in a new window]

Abstract

Information

Type
Correspondence
Copyright
Copyright © International Glaciological Society 1979
Figure 0

Fig. 1.North and east components of displacement of the drill at Byrd Station, Antarctica, as it deviated during drilling, 1967-68. (Data from Garfield and Ueda (1976).)

Figure 1

Fig. 2.Model for the deviation of a drill in a shear straining ice mass.

Figure 2

Fig. 3.Predicted drill deviation for the Byrd bore hole. The dashed line is simply a linear extrapolation, as the hole was inaccessible beneath 1474 m depth.