Hostname: page-component-7b7567c8c-wxvwp Total loading time: 0 Render date: 2026-11-16T17:36:28.505Z Has data issue: false hasContentIssue false

A suggested approach to site storage resources in transmission planning models

Published online by Cambridge University Press:  10 September 2020

Rao Konidena*
Affiliation:
Rakon Energy LLC, Roseville, MN, USA
*
Address all correspondence to Rao Konidena at rkonidena76@gmail.com
Get access

Abstract

Placing a large storage project at one transmission node influences the transmission flows in the model. Hence, planners need an approach that estimates future storage services and logically places storage at multiple transmission nodes.

In planning models, it is hard to forecast which service storage might provide at any given hour because storage provides a wide variety of services such as capacity benefit, peaker replacement, reduction in renewable energy curtailment, and ancillary services. But transmission planning models are required to address North American Electric Reliability Corporation (NERC) reliability standards and criteria, with assumptions for planned additions of generation, transmission, and demand response resources. Hence, planners must assume a basic set of services for storage resources.

And this paper outlines a suggested approach to site storage resources in planning models by focusing on the generator interconnection queue for utility-scale storage and energy-intensive industries for commercial and industrial customers.

Information

Type
Perspective
Copyright
Copyright © The Author, 2020, published on behalf of Materials Research Society by Cambridge University Press

Access options

Get access to the full version of this content by using one of the access options below. (Log in options will check for institutional or personal access. Content may require purchase if you do not have access.)

Article purchase

Temporarily unavailable