Hostname: page-component-7b7567c8c-tnkh4 Total loading time: 0 Render date: 2026-11-16T02:18:46.213Z Has data issue: false hasContentIssue false

The impact of tsetse fly control campaigns on African wildlife

Published online by Cambridge University Press:  24 April 2009

Peter Matthiessen
Affiliation:
MAFF, Directorate of Fisheries Research, Fisheries Laboratory, Remembrance Avenue, Bumham-on-Crouch, Essex CMO 8HA, UK.
Bob Douthwaite
Affiliation:
Tropical Development and Research Institute, Overseas Development Administration, College House, Wrights Lane, London W8 5SJ, UK.
Rights & Permissions [Opens in a new window]

Abstract

Core share and HTML view are not available for this content. However, as you have access to this content, a full PDF is available via the 'Save PDF' action button.

From its earliest years, the Society's journal has carried reports on the tsetse problem in Africa. Between the 1920s and 1960s, attempts to eradicate the flies from many parts of the country resulted in the slaughter of 1.3 million game animals and extensive bush clearance, which permanently destroyed wildlife habitat. By the early 1970s, the use of insecticides had largely replaced these drastic techniques, but this, in its turn, with the environmental side-effects, caused much concern amongst wildlife conservationists. The authors review the history of tsetse control and discuss the new, safer methods that have been developed, as well as others still under trial. It is clear, however, that tsetse eradication will continue to be controversial. The development of safer and environmentally acceptable techniques does not solve a more fundamental problem—the wise use of Africa's land. Clearing the land of tsetse can open the path to its ruin by unsustainable pastoral encroachment. It is of interest that in April 1985, the EEC governments forced the EEC Commission to modify its forthcoming programme of tsetse fly eradication in four countries by insisting that environmentally harmful methods using DDT should not be employed. The Commission was also forced to include a three-year project on area development planning—land-use considerations were originally not included in its proposals.

Information

Type
Research Article
Copyright
Copyright © Fauna and Flora International 1985