Hostname: page-component-7b7567c8c-z4zkx Total loading time: 0 Render date: 2026-11-16T23:56:45.993Z Has data issue: false hasContentIssue false

DYNAMIC ANALYSIS OF A MULTIVARIATE REWARD PROCESS DEFINED ON THE UMCP WITH APPLICATION TO OPTIMAL PREVENTIVE MAINTENANCE POLICY PROBLEMS IN MANUFACTURING

Published online by Cambridge University Press:  28 March 2013

Jia-Ping Huang
Affiliation:
Department of Econometrics and OR, FEWEB, VU University Amsterdam, De Boelelaan 1105, 1081 HV Amsterdam, The Netherlands E-mail: j.huang@vu.nl
Ushio Sumita
Affiliation:
Division of Policy and Planning Sciences, Faculty of Engineering, Information and Systems, University of Tsukuba, 1-1-1 Tennoudai, Tsukuba, Ibaraki 305-8573, Japan E-mail: sumita@sk.tsukuba.ac.jp
Rights & Permissions [Opens in a new window]

Abstract

Core share and HTML view are not available for this content. However, as you have access to this content, a full PDF is available via the 'Save PDF' action button.

The unified multivariate counting process (UMCP), previously studied by the same authors, enables one to describe most of the existing counting processes in terms of its components, thereby providing a comprehensive view for such processes often defined separately and differently. The purpose of this paper is to study a multivariate reward process defined on the UMCP. By examining the probabilistic flow in its state space, various transform results are obtained. The asymptotic behavior, as t→∞, of the expected univariate reward process in a form of a product of components of the multivariate reward process is studied. As an application, a manufacturing system is considered, where the cumulative profit given a preventive maintenance policy is described as a univariate reward process defined on the UMCP. The optimal preventive maintenance policy is derived numerically by maximizing the cumulative profit over the time interval [0, T].

Information

Type
Research Article
Copyright
Copyright © Cambridge University Press 2013