Hostname: page-component-7b7567c8c-tnkh4 Total loading time: 0 Render date: 2026-11-16T08:48:49.577Z Has data issue: false hasContentIssue false

STOCHASTIC MULTI-ITEM INVENTORY SYSTEMS WITH MARKOV-MODULATED DEMANDS AND PRODUCTION QUANTITY REQUIREMENTS

Published online by Cambridge University Press:  27 April 2012

Aykut Atalı
Affiliation:
McKinsey & Company, Chicago, IL 60603 E-mail: aykut_atali@mckinsey.com
Özalp Özer
Affiliation:
School of Management, The University of Texas at Dallas, 800 W. Campbell Rd, Richardson, TX 75080 E-mail: oozer@utdallas.edu
Rights & Permissions [Opens in a new window]

Abstract

Core share and HTML view are not available for this content. However, as you have access to this content, a full PDF is available via the 'Save PDF' action button.

We study a multi-item two-stage production system subject to Markov-modulated demands and production quantity requirements. The demand distribution for each item in each period is governed by a discrete Markov chain. The products are manufactured in two stages. In the first stage, a common intermediate product is manufactured, followed by product differentiation in the second stage. Lower and upper production limits, also known as production smoothing constraints, are imposed on both stages for all items. We propose a close-to-optimal heuristic to manage this system. To do so, we develop a lower bound problem and show that a state-dependent, modified base-stock policy is optimal. We also show when and why the heuristic works well. In our numerical study, the average optimality gap was 4.34%. We also establish some monotonicity results for policy parameters with respect to the production environment. Using these results and our numerical observations, we investigate the joint effect of (i) the two-stage production process, (ii) the production flexibility, and (iii) the fluctuating demand environment on the system's performance. For example, we quantify the value of flexible production as well as the effect of smoothing constraints on the benefits of postponement. We show that a redesign of the production process to allow for delayed product differentiation is more effective and valuable when it is accompanied by an investment in production flexibility.

Information

Type
Research Article
Copyright
Copyright © Cambridge University Press 2012