Hostname: page-component-7b7567c8c-fvjsw Total loading time: 0 Render date: 2026-11-16T20:46:13.969Z Has data issue: false hasContentIssue false

Démantèlement de l’installation nucléaire de base 106(LURE)

Published online by Cambridge University Press:  02 August 2013

N. Pauwels
Affiliation:
CNRS/Unité de Démantèlement de l’INB 106 (LURE), Centre Universitaire Paris Sud, Bâtiment 201 porte 1, 91898 Orsay Cedex, France.
J.M. Horodynski
Affiliation:
CNRS/Unité de Démantèlement de l’INB 106 (LURE), Centre Universitaire Paris Sud, Bâtiment 201 porte 1, 91898 Orsay Cedex, France.
P. Robert
Affiliation:
CNRS/Unité de Démantèlement de l’INB 106 (LURE), Centre Universitaire Paris Sud, Bâtiment 201 porte 1, 91898 Orsay Cedex, France.
A. Tadjeddine
Affiliation:
Laboratoire de Chimie Physique, Centre Universitaire Paris Sud, Bâtiment 349, 91898 Orsay Cedex, France.

Abstract

Core share and HTML view are not available for this content. However, as you have access to this content, a full PDF is available via the 'Save PDF' action button.

Dans le but d’obtenir le déclassement de l’installation nucléaire de base 106 (INB 106),trois de ses accélérateurs ont été arrêtés puis démantelés et un autre modifié pour passersous le seuil de classement INB. Le démantèlement a été mené sur la base d’une stratégiede démontage mécanique sans découpe. Les éléments de génie civil peu activés ont pour latrès grande majorité été laissés en place sans traitement avec des mesures compensatoiresde protection du public et de l’environnement. Le résultat global de ces opérations est ungain en termes de coût et de délais et une importante diminution des risques notammentradiologiques, l’impact du site à l’état final restant acceptable.

Information

Type
Research Article
Copyright
© EDP Sciences, 2013