Hostname: page-component-74656f9884-j7cmm Total loading time: 0 Render date: 2026-11-07T10:08:30.954Z Has data issue: false hasContentIssue false

On the dual risk model with Parisian implementation delays under a mixed dividend strategy

Published online by Cambridge University Press:  09 January 2023

Kang Hu
Affiliation:
MOE-LCSM, School of Mathematics and Statistics, Hunan Normal University, Changsha, Hunan 410081, P.R. China
Jingchao Li
Affiliation:
College of Mathematics and Statistics, Shenzhen University, Shenzhen, Guangdong 518060, P.R. China. E-mail: jingchaoli@szu.edu.cn
Jieming Zhou
Affiliation:
Key Laboratory of Applied Statistics and Data Science, Hunan Normal University, College of Hunan Province, Changsha, Hunan 410081, P.R. China. E-mail: jmzhou@hunnu.edu.cn
Rights & Permissions [Opens in a new window]

Abstract

In this paper, we consider a mixed dividend strategy in a dual risk model. The mixed dividend strategy is the combination of a threshold dividend and a Parisian implementation delays dividend under periodic observation. Given a series of discrete observation points, when the surplus level is larger than the predetermined bonus barrier at observation point, the Parisian implementation delays dividend is immediately carried out, and the threshold dividend is performed continuously during the delayed period. We study the Gerber-Shiu expected discounted penalty function and the expected discounted dividend payments before ruin in such a dual risk model. Numerical illustrations are given to study the influence of relevant parameters on the ruin-related quantities and the selection of the optimal dividend barrier for a given initial surplus level.

Information

Type
Research Article
Copyright
© The Author(s), 2023. Published by Cambridge University Press
Figure 0

Figure 1. Sample path of $\{U_{b}^{d}(t)\}_{t\geq 0}$.

Figure 1

Figure 2. Sample path before and after folding.

Figure 2

Figure 3. Sample path before and after folding.

Figure 3

Table 1. $c=0.5$, $c_{1}=0.25$, $\beta =1$, $a_{1}=1$, $d=2$, $b=10$, $\delta =0.1$.

Figure 4

Table 2. $c=0.5$, $c_{1}=0.25$, $\beta =1$, $\lambda =1$, $d=2$, $b=10$, $\delta =0.1$.

Figure 5

Table 3. $c=0.5$, $c_{1}=0.25$, $\beta =1$, $a_{1}=1$, $\lambda =1$, $b=10$, $\delta =0.1$.

Figure 6

Table 4. $c=0.5$, $c_{1}=0.25$, $\beta =1$, $a_{1}=1$, $d=2$, $b=10$, $\delta =0.1$.

Figure 7

Table 5. $c=0.5$, $c_{1}=0.25$, $\beta =1$, $\lambda =1$, $d=2$, $b=10$, $\delta =0.1$.

Figure 8

Table 6. $c=0.5$, $c_{1}=0.25$, $\beta =1$, $a_{1}=1$, $\lambda =1$, $b=10$, $\delta =0.1$.

Figure 9

Figure 4. $V(x)$ for u = 2 with parameters $c=0.5$, $c_1=0.25$, $\beta =1$, $a_{1}=1$, $\lambda =1$, $d=2$, $\delta =0.1$.

Figure 10

Figure 5. $V(u)$ for $u=12$ with parameters $c=0.5$, $c_1=0.25$, $\beta =1$, $a_{1}=1$, $\lambda =1$, $d=2$, $\delta =0.1$.

Figure 11

Figure 6. $V(u)\ {\rm for}\; u=-2$ with parameters $c=0.5$, $c_1=0.25$, $\beta =1$, $a_{1}=1$, $\lambda =1$, $d=2$, $\delta =0.1$.