Hostname: page-component-74656f9884-npj9w Total loading time: 0 Render date: 2026-11-07T09:14:11.550Z Has data issue: false hasContentIssue false

New repetitive motion planning scheme with cube end-effector planning precision for redundant robotic manipulators

Published online by Cambridge University Press:  31 August 2021

Limin Shen*
Affiliation:
Department of Mechanical and Electronic Engineering, Guangzhou Railway Polytechnic, Guangzhou 510430, China
Yuanmei Wen
Affiliation:
School of Information Engineering, Guangdong University of Technology, Guangzhou 510006, China E-mail: shenlimin2019@126.com
*
*Corresponding author. E-mail: slmluck@126.com
Rights & Permissions [Opens in a new window]

Abstract

Repetitive motion planning (RMP) is important in operating redundant robotic manipulators. In this paper, a new RMP scheme that is based on the pseudoinverse formulation is proposed for redundant robotic manipulators. Such a scheme is derived from the discretization of an existing RMP scheme by utilizing the difference formula. Then, theoretical analysis and results are presented to show the characteristic of the proposed RMP scheme. That is, this scheme possesses the characteristic of cube pattern in the end-effector planning precision. The proposed RMP scheme is further extended and studied for redundant robotic manipulators under joint constraint. Based on a four-link robotic manipulator, simulation results substantiate the effectiveness and superiority of the proposed RMP scheme and its extended one.

Information

Type
Research Article
Copyright
© The Author(s), 2021. Published by Cambridge University Press
Figure 0

Figure 1. Simulation results using the proposed RMP scheme (7) with $\eta=0.01$, $h=0.5$ and $\nu=0$ for the four-link robotic manipulator performing the tricuspid path planning task. (a) Robotic trajectory. (b) End-effector planning error. (c) Joint angle.

Figure 1

Figure 2. Simulation results using the proposed RMP scheme (7) with $\eta=0.01$, $h=0.5$ and $\nu=0.5$ for the four-link robotic manipulator performing the tricuspid path planning task. (a) Robotic trajectory. (b) End-effector planning error. (c) Joint angle.

Figure 2

Figure 3. Simulation results using the proposed RMP scheme (7) with $\eta=0.01$, $h=0.6$, and $\nu=0.5$ for the four-link robotic manipulator performing the tricuspid path planning task. (a) Robotic trajectory. (b) End-effector planning error. (c) Joint angle.

Figure 3

Figure 4. Simulation results using the proposed RMP scheme (7) with $\eta=0.001$, $h=0.6$, and $\nu=0.5$ for the four-link robotic manipulator performing the tricuspid path planning task. (a) Robotic trajectory. (b) End-effector planning error. (c) Joint angle.

Figure 4

Figure 5. Simulation results using the proposed RMP scheme (7) with $\eta=0.01$, $h=0$, and $\nu=0.5$ for the four-link robotic manipulator performing the tricuspid path planning task. (a) Robotic trajectory. (b) End-effector planning error. (c) Joint angle.

Figure 5

Figure 6. End-effector planning error using the proposed RMP scheme (7) with $\eta=0.01$, $\nu=0.5$, and different h for the four-link robotic manipulator performing the tricuspid path planning task. (a) With $h=0.4$. (b) With $h=0.5$. (c) With $h=0.6$.

Figure 6

Figure 7. Simulation results using the proposed RMP scheme (7) with $\eta=0.01$, $h=0.5$, and $\nu=0.5$ for the four-link robotic manipulator performing the Lissajous path planning task. (a) Robotic trajectory. (b) End-effector planning error. (c) Joint angle.

Figure 7

Figure 8. Simulation results using the proposed RMP scheme (7) with $\eta=0.01$, $h=0.5$, and $\nu=0.5$ for the four-link robotic manipulator performing the Rhodonea path planning task. (a) Robotic trajectory. (b) End-effector planning error. (c) Joint angle.

Figure 8

Figure 9. Simulation results using the extended RMP scheme (18) with $\eta=0.01$, $h=0.5$, $\nu=1.0$, and $\delta=0.01$ for the four-link robotic manipulator performing the tricuspid path planning task. (a) Robotic trajectory. (b) End-effector planning error within [0,1] s. (c) End-effector planning error within [1,10] s. (d) Joint angle.

Figure 9

Figure 10. Simulation results using the extended RMP scheme (18) with $\eta=0.001$, $h=0.5$, $\nu=1.0$, and $\delta=0.01$ for the four-link robotic manipulator performing the tricuspid path planning task. (a) Robotic trajectory. (b) End-effector planning error within [0,1] s. (c) End-effector planning error within [1,10] s. (d) Joint angle.

Figure 10

Figure 11. Simulation results using the extended RMP scheme (18) with $\eta=0.01$, $h=0.5$, $\nu=1.0$, and $\delta=0.01$ for the four-link robotic manipulator performing the Lissajous path planning task. (a) Robotic trajectory. (b) End-effector planning error within [0,1] s. (c) End-effector planning error within [1,10] s. (d) Joint angle.

Figure 11

Figure 12. Simulation results using the extended RMP scheme (18) with $\eta=0.01$, $h=0.5$, $\nu=1.0$, and $\delta=0.01$ for the four-link robotic manipulator performing the Rhodonea path planning task. (a) Robotic trajectory. (b) End-effector planning error within [0,1] s. (c) End-effector planning error within [1,10] s. (d) Joint angle.