On component failure in coherent systems with applications to maintenance strategies

Published online by Cambridge University Press:  03 December 2020

M. Hashemi*
Affiliation:
University of Isfahan
M. Asadi*
Affiliation:
University of Isfahan and IPM
*
*Postal address: Department of Statistics, Faculty of Mathematics and Statistics, University of Isfahan, Isfahan 81746-73441, Iran.
*Postal address: Department of Statistics, Faculty of Mathematics and Statistics, University of Isfahan, Isfahan 81746-73441, Iran.
Rights & Permissions [Opens in a new window]

Abstract

Providing optimal strategies for maintaining technical systems in good working condition is an important goal in reliability engineering. The main aim of this paper is to propose some optimal maintenance policies for coherent systems based on some partial information about the status of components in the system. For this purpose, in the first part of the paper, we propose two criteria under which we compute the probability of the number of failed components in a coherent system with independent and identically distributed components. The first proposed criterion utilizes partial information about the status of the components with a single inspection of the system, and the second one uses partial information about the status of component failure under double monitoring of the system. In the computation of both criteria, we use the notion of the signature vector associated with the system. Some stochastic comparisons between two coherent systems have been made based on the proposed concepts. Then, by imposing some cost functions, we introduce new approaches to the optimal corrective and preventive maintenance of coherent systems. To illustrate the results, some examples are examined numerically and graphically.

Information

Type
Original Article
Copyright
© Applied Probability Trust 2020
Figure 0

Figure 1: The bridge system.

Figure 1

Figure 2: (a) The plots of ${p^t_{k,n}(i)}$ for ${i=1, 2,3}$ and ${k=1}$ in Example 2.1. (b) The plots of ${H_{k,n}^t}$ for ${k=0, 1,2}$ in Example 2.1.

Figure 2

Figure 3: Maintenance Strategy ${\textbf{I}}$.

Figure 3

Figure 4: The expected cost of the system maintenance per unit time in Example 3.1: (a) ${\tau=0.1}$, ${k=1,2,3}$ from top to bottom; (b) ${k=0}$, ${\tau=0.1,0.3,0.5}$ from top to bottom.

Figure 4

Table 1: Optimal maintenance time for Strategy ${\textbf{I}}$.

Figure 5

Table 2: Optimal maintenance time for Strategy ${\textbf{I}}$.

Figure 6

Table 3: Optimal maintenance times for Strategy ${\textbf{I}}$ with ${k=2}$, ${c_{min}=0.5}$, ${c_{cms}=25}$, ${c_{pms}=4}$, ${c_{cm}=2}$, and ${c_{pm}=1}$.

Figure 7

Table 4: Bivariate optimal maintenance times for Strategy ${\textbf{I}}$.

Figure 8

Figure 5: The three-dimensional plot of cost function in Example 3.1: (a) ${k=0}$, (b) ${k=2}$.

Figure 9

Figure 6: The stationary availability in Example 3.1: (a) ${\tau=0.1}$, ${k=1,2,3}$ from top to bottom; (b) ${k=0}$, ${\tau=0.1,0.3,0.5}$ from top to bottom.

Figure 10

Figure 7: The expected cost of the system maintenance per unit time in Example 3.1 with ${h(a_1(t,i),a_2(t))=3t+a_2(t)}$ where ${a_2(t)}$ follows the normal distribution with mean 1: (a) ${\tau=0.1}$, ${k=1,2,3}$ from top to bottom; (b) ${k=0}$, ${\tau=0.1,0.3,0.5}$ from top to bottom.

Figure 11

Table 5: Optimal maintenance time for Strategy ${\textbf{I}}$ with ${\tau=0}$.

Figure 12

Figure 8: (a) The average maintenance cost per unit time in Example 3.2; (b) the stationary availability in Example 3.2.

Figure 13

Figure 9: Maintenance Strategy ${\textbf{II}}$.

Figure 14

Figure 10: (a) The average maintenance cost per unit time in Example 3.3; (b) the stationary availability for Strategy ${\textbf{II}}$ in Example 3.3.

Figure 15

Table 6: Optimal maintenance time for Strategy ${\textbf{II}}$ with ${t_1=0.5}$, ${k=1}$.

Figure 16

Table 7: Bivariate optimal maintenance times for Strategy ${\textbf{II}}$.

Figure 17

Figure 11: The three-dimensional plot of the cost function in Example 3.3.