Hostname: page-component-7b7567c8c-fvjsw Total loading time: 0 Render date: 2026-11-15T06:29:21.776Z Has data issue: false hasContentIssue false

Inferential statistics to verify prediction models

Published online by Cambridge University Press:  20 January 2017

R. Bolognesi*
Affiliation:
Swiss Federal Institute for Snow and Avalanche Research,, Antenne Valais, CH-1951 Sion,, Switzerland
Rights & Permissions [Opens in a new window]

Abstract

Models are powerful tools if their outputs are relevant!

Therefore, knowing the reliability of models is essential for people who wish to use them, as well as for researchers who attempt to improve them. Whatever the nature of the model output, objective evaluation consists of comparing predicted or calculated events with observed events.

Such comparison can only focus on available samples of observed events. Obviously, the results depend on the choice of the sample. However, inferential statistics enable one to extend results obtained from a random sample to general use.

An unbiased method of testing boolean avalanche-prediction models is suggested: the validity of this type of model should be characterized by the probability that the proportion of correct forecasts is within a given confidence interval. This interval is calculated from the sample size, according to the Gaussian table.

This unrestricted principle can be used to prove all kinds of static models, if ever their outputs are verifiable, enabling one to calculate the ratios of correct forecasts as well as the ratios of well-predicted events and can also be extended to verify probabilistic predictions.

Information

Type
Research Article
Copyright
Copyright © International Glaciological Society 1998
Figure 0

Fig. 1.The sample S’ used for the verification of a model is a sub-set of the infinite set S of past and future forecasts. To evaluate a model, it is possible to use either all verified forecasts at our disposal, assuming that the corresponding situations have randomly occurred, or only part of the verified forecasts, in which case this part must be a random sample.

Figure 1

Fig. 2.Minimal accuracy of a model reliability estimation, depending on the size of the verification sample with various coefficients of confidence.

Figure 2

Fig. 3.Verification of a model for practical use. p1 is the proportion of correct occurrence forecasts and p2 is the proportion of correct non-occurrence forecasts which can be expected from the model.

Figure 3

Fig. 4.Distribution Junction (diagram) and cumulative distribution function ϕ (curve) of the random variable p’(P(pi’) assumed equivalent to calculated frequencies of pi’).

Figure 4

Fig. 5.(a) Contingency table showing an imperfect but usable model. (b) Contingency table showing a fanciful and unusable model which yet gives a high ratio of correct predictions.