Hostname: page-component-74656f9884-npj9w Total loading time: 0 Render date: 2026-11-07T03:35:23.023Z Has data issue: false hasContentIssue false

A-RAIM and R-RAIM Performance using the Classic and MHSS Methods

Published online by Cambridge University Press:  15 August 2013

Yiping Jiang*
Affiliation:
(Surveying and Geospatial Engineering, School of Civil and Environmental Engineering University of New South Wales, Sydney, Australia)
Jinling Wang
Affiliation:
(Surveying and Geospatial Engineering, School of Civil and Environmental Engineering University of New South Wales, Sydney, Australia)
Rights & Permissions [Opens in a new window]

Abstract

Two Receiver Autonomous Integrity Monitoring (RAIM) architectures, Advanced RAIM (A-RAIM) and Relative RAIM (R-RAIM), are compared with two different RAIM algorithms, the Classic method and the Multiple Hypothesis Solution Separation (MHSS) method. The difference between A-RAIM and R-RAIM is in the positioning methods that produce different error models and projection matrices for integrity monitoring. The difference between RAIM algorithms lies in the methods of risk distribution. The influences of different positioning methods on integrity results are analysed in this paper via a generalized RAIM framework. Simulation results for the LPV-200 service with worldwide coverage show that the R-RAIM position domain method has the best results, while the differences between these methods decrease with application of the optimization method.

Information

Type
Research Article
Copyright
Copyright © The Royal Institute of Navigation 2013 
Figure 0

Table 1. Existing A-RAIM and R-RAIM Mechanisms.

Figure 1

Figure 1. 99% Availability with A-RAIM Classic.

Figure 2

Figure 2. 99% Availability with Range R-RAIM Method. Classic Method.

Figure 3

Figure 3. 99% Availability with Position R-RAIM Classic Method.

Figure 4

Figure 4. 99% Availability with A-RAIM MHSS Method.

Figure 5

Figure 5. 99% Availability with Range R-RAIM MHSS Method.

Figure 6

Figure 6. 99% Availability with Position R-RAIM MHSS Method, CT=1 min.

Figure 7

Table 2. 99% Availability with A-RAIM and R-RAIM, VAL=35 m.

Figure 8

Table 3. R-RAIM Range with Different CT, VAL=35 m.

Figure 9

Table 4. R-RAIM Position with Different CT, VAL=35 m.

Figure 10

Table 5. A-RAIM and R-RAIM with Optimization, VAL=10 m.

Figure 11

Table 6. A-RAIM and R-RAIM with Optimization, VAL=15 m.