Hostname: page-component-7b7567c8c-mnklg Total loading time: 0 Render date: 2026-11-12T07:25:18.630Z Has data issue: false hasContentIssue false

Technical innovations and optimizations for intermediate ice-core drilling operations

Published online by Cambridge University Press:  26 July 2017

Jack Triest
Affiliation:
British Antarctic Survey, Natural Environment Research Council, Cambridge, UK E-mail: jack.triest@lgge.obs.ujf-grenoble.frLaboratoire de Glaciologie et Géophysique de l’Environnement (LGGE), Université Grenoble Alpes and Centre National de la Recherche Scientifique (CNRS), Grenoble, France
Robert Mulvaney
Affiliation:
British Antarctic Survey, Natural Environment Research Council, Cambridge, UK E-mail: jack.triest@lgge.obs.ujf-grenoble.fr
Olivier Alemany
Affiliation:
Laboratoire de Glaciologie et Géophysique de l’Environnement (LGGE), Université Grenoble Alpes and Centre National de la Recherche Scientifique (CNRS), Grenoble, France
Rights & Permissions [Opens in a new window]

Abstract

The British Antarctic Survey, in collaboration with Laboratoire de Glaciologie et Géophysique de l’Environnement, has in recent years successfully drilled to bedrock on three remote sites around the Antarctic Peninsula. Based on the experience from the multi-season project at Berkner Island (948m depth, 2002–05) we optimized the drill set-up to better suit two subsequent single-season projects at James Ross Island (363m depth, 2008) and Fletcher Promontory (654m depth, 2012). The adaptations, as well as the reasons for them, are discussed in detail and include a drill tent set-up without a trench; drilling without a borehole casing with a relatively low fluid column height; and using a shorter drill. These optimizations were aimed at reducing cargo loads and installation time while maintaining good core quality, productivity and a safe working environment. In addition, we introduce a number of innovations, ranging from a new lightweight cable tensioning device and drill-head design to core storage and protection trays. To minimize the environmental impact, all the drill fluid was successfully recovered at both sites and we describe and evaluate this operation.

Keywords

Information

Type
Research Article
Copyright
Copyright © International Glaciological Society 2014
Figure 0

Fig. 1.Modified arch detail.

Figure 1

Fig. 2.Roof slot.

Figure 2

Fig. 3.Floor layout.

Figure 3

Fig. 4.Floor construction.

Figure 4

Fig. 5.Production curves.

Figure 5

Fig. 6.Cable spooler.

Figure 6

Fig. 7.Split-bearing detail.

Figure 7

Fig. 8.Magnetic particle break.

Figure 8

Fig. 9.Daily core production.

Figure 9

Fig. 10.Core details and fluid column.

Figure 10

Fig. 11.Drill head.

Figure 11

Fig. 12.Cutter details.

Figure 12

Fig. 13.Core protection trays.

Figure 13

Fig. 14.Fluid-bailing tube. ϕ is diameter. Units are mm.

Figure 14

Fig. 15.Fluid run times. Dates are day/month/year.