The Management of Sediment Transported by Glacial Melt-Water Streams and its Significance for the Estimation of Sediment Yield

Published online by Cambridge University Press:  20 January 2017

A. Bezinge
Affiliation:
Grande Dixence S.A., CH-1950 Sion, Valais, Switzerland
M.J. Clark
Affiliation:
Grande Dixence S.A., CH-1950 Sion, Valais, Switzerland
A.M. Gurnell
Affiliation:
Department of Geography, University of Southampton, Southampton S09 5NH, England, U.K.
J. Warburton
Affiliation:
Department of Geography, University of Southampton, Southampton S09 5NH, England, U.K.
Rights & Permissions [Opens in a new window]

Abstract

This paper describes the calibration of sediment traps in melt-water intake structures of the Grande Dixence hydro-electricity scheme for the purpose of generating medium-term estimates of suspended sediment and bedload transport by pro-glacial streams. The frequency of emptying/purging of sediment from traps in 17 glacier basins in the Val d’Hérens is combined with their design sediment volume to provide first approximations of the mean annual volume of sediment purged. This is followed by more detailed consideration of 11 years of records from three of the basins, to investigate mean seasonal and inter-annual patterns of purging. The difficulties of relating sediment purging to sediment transport are considered. A sediment calibration strategy based on 2 years of turbidity records, hand sampling of suspended sediment concentration, and monitoring of the accumulation of sediment in sediment traps is proposed for one of the glacier basins, and is checked using hourly and 4 h suspended sediment observations from two further ablation seasons. The calibration is applied to 10 years of discharge and purge records to establish estimates of mean seasonal and inter-annual patterns of suspended sediment and bed-load transport.

Information

Type
Research Article
Copyright
Copyright © International Glaciological Society 1989
Figure 0

Fig. 1.Glacier basins contributing to the Grande Dixence hydro-electricity scheme in the Val d’Hérens.

Figure 1

Table I.Preliminary estimates of mean sediment yield for basins of val d’herens, based on purging of water-intake sediment traps (1970–80)

Figure 2

Fig. 2.Schematic diagram of the Tsidjiore Nouve and Bas Arolla melt-water intake structures.

Figure 3

Fig. 3.Mean weekly melt-water discharge and purge frequency – Haut Arolla, Bas Arolla, and Tsidjiore Nouve basins.

Figure 4

Fig. 4.Annual purge frequency in relation to annual discharge volume and glacier-snout advance – Haut Arolla, Bas Arolla, and Tsidjiore Nouve.

Figure 5

Fig. 5.Mean weekly melt-water discharge, and estimated suspended-sediment and bed-load yield (1977, 1979–87) from the Tsidjiore Nouve basin.

Figure 6

Fig. 6.Estimated annual sediment yield (1977, 1979–87) from the Tsidjiore Nouve basin in relation to annual discharge volume and glacier-snout advance.