Hostname: page-component-74656f9884-npj9w Total loading time: 0 Render date: 2026-11-08T21:51:30.237Z Has data issue: false hasContentIssue false

Urban planning by obliteration of both waterways and opponents: the infilling of canals during the 1950s reconstruction of central Tokyo

Published online by Cambridge University Press:  12 December 2014

JUNICHI HASEGAWA*
Affiliation:
Faculty of Economics, Keio University, 2–15–45 Mita, Minato-ku, Tokyo 108 – 8345, Japan
Rights & Permissions [Opens in a new window]

Abstract

This article examines the infilling of canals constructed in early modern times and subsequent development on newly created land in central Tokyo in the 1950s, following the curtailment of official war-damage reconstruction after World War II. New developments included a high-rise central station building, a four-storey amusement complex, an underground entertainment street and an elevated motorway. The Tokyo Metropolitan Government and Japanese National Railways were driving forces in infilling and development, which resulted in enormous political and social reactions in the local communities, newspapers and the National Diet (Parliament).

Information

Type
Research Article
Copyright
Copyright © Cambridge University Press 2014 
Figure 0

Figure 1 Tokyo Station and Ginza district in 2014Metropolitan Expressway Inner Circular Route opened to traffic in December 1962 as the first route of Metropolitan Expressway Public Corporation's expressway network. The Corporation was established in June 1959. Ginza district falls under an area surrounded by Tokyo Expressway and Metropolitan Expressway Inner Circular Route. A suffix ‘bashi’ as in Kajibashi, Konyabashi, Nanbabashi and Miharabashi means a bridge, indicating that the place used to be a bridge on a canal.

Figure 1

Figure 2 River Sanjikkenbori before infillingThe photograph was taken by Chuo Metropolitan Ward in 1948. The width of Sanjukkenbori was reduced by infilling from 30 ken (approximately 55 m) to 19 ken (approximately 35 m) in 1828 to increase the river bank.Source: Courtesy of Chuo City Kyobashi Library.

Figure 2

Figure 3 Infilling of River Sanjikkenbori in progressThe photograph was taken by Chuo Metropolitan Ward in 1948. 80 trucks per day were said to be used for infilling.Source: Courtesy of Chuo City Kyobashi Library.

Figure 3

Figure 4 Infilling of River Sanjikkenbori near completionThe photograph was taken by Chuo Metropolitan Ward in 1949. 7.2-m-wide road was under construction in the middle of the infilled land.Source: Courtesy of Chuo City Kyobashi Library.

Figure 4

Figure 5 Tokyo SpaThe photograph was taken by Chuo Metropolitan Ward in 1957. The building with a chimney in the middle of the photograph is Tokyo Spa. It was demolished in 1986.Source: Courtesy of Chuo City Kyobashi Library.

Figure 5

Figure 6 Railway House (Daimaru department store)The photograph was taken by Chuo Metropolitan Ward in 1957. The building was six-storey high at this stage. It was demolished in 2009.Source: Courtesy of Chuo City Kyobashi Library.

Figure 6

Figure 7 Tokyo Expressway under constructionThe photograph was taken by Chuo Metropolitan Ward in 1957. A tower with a car at the top was an advertisement for Toyota's car dealer. In front, there was a signboard reading Fujiya which was a chain confectionery. A wide street with a tram along the Expressway was Sotoboridori, connecting Tokyo Station and Shinbashi Station.Source: Courtesy of Chuo City Kyobashi Library.