In its preliminary reportFootnote 1 six months after the Fukushima accident of 11 March 2011, some of the findings of the IAEA were that:
The tsunami hazard for several sites was underestimated. Nuclear regulatory systems should address extreme external events adequately, including their periodic review, and should ensure that regulatory independence and clarity of roles are preserved in all circumstances in line with IAEA Safety Standards.Footnote 2
The IAEA also found that, notwithstanding the fact that the catastrophe was caused by a natural disaster, there were, inter alia, serious deficiencies in the siting and design of the plant and the emergency readiness of the country, as well as an incomplete and imprecise legislative and regulatory framework.Footnote 3 Thus, the nuclear accident raised questions about the implementation of the Convention on Nuclear Safety (NSC)Footnote 4 and the IAEA safety standards by the Japanese authorities. Moreover, the events prior and subsequent to the accident demonstrated the need to revisit the obligations deriving from the various provisions of the Convention, especially provisions relating to powers of the national regulatory body and the safety of installations. Consequently, states producing nuclear energy began to re-evaluate their own domestic nuclear energy capacity and regulatory and legislative frameworks in order to assess the safety of national nuclear power plants in the light of the Japanese catastrophe.Footnote 5
The Fifth Review Meeting of the NSC was also convened in Vienna, Austria, from 4 to 14 April 2011 to discuss safety issues and draw lessons from the Fukushima accident. At this meeting the parties also reiterated the need to:
[R]eaffirm their commitment to the objectives of the NSC: to achieve and maintain a high level of nuclear safety worldwide through enhancement of national measures and international cooperation; to establish and maintain effective defences in nuclear installations against potential radiological hazards and to prevent accidents with radiological consequences and to mitigate such consequences should they occur.Footnote 6
This article will first briefly chronicle the events that occurred prior to and after the accident in order to evaluate the response of the Japanese government. Second, it will analyze the provisions of the NSC and the IAEA safety standards that are relevant in this case. Third, it will evaluate the implementation of the relevant NSC provisions by the Japanese authorities in order to assess its compliance with the Convention. This consequently raises the issue of Japan's international responsibility for wrongful acts in the case of Fukushima. Finally, the suggestions and recommendations for reviewing the effectiveness of the NSC provisions will be analyzed.
I. The Fukushima Accident
The nuclear accident that occurred in the Fukushima Daiichi Nuclear Power Plant on 11 March 2011 was a result of a major earthquake of magnitude 9.0 and the subsequent tsunami of 14 to 15 metres that rose at its highest to 39 metres at Aneyoshi, Miyako.Footnote 7 The human consequences of these events were devastating. According to the UN Office for the Coordination of Humanitarian Affairs, around 16,600 persons went missing, while many more were displaced from their homes.Footnote 8 The World Nuclear Association stated that the tsunami alone caused the deaths of 20,000 people.Footnote 9 The natural disaster also caused major destruction of infrastructure and the loss of many homes.Footnote 10 The World Health Organization and the Food and Agriculture Organization highlighted enduring health concerns which involve the development of cancer and other illnesses due to a long-term radiation exposure as well as the radioactive contamination of food and radioactivity of the soil and surrounding environment.Footnote 11
Several nuclear power plants in the vicinity were affected by the natural disaster: Tokai, Higashi Dori, Onagawa, Daiichi, and Dai-ni.Footnote 12 The worst affected was TEPCO's (Tokyo Electric Power Co.) Daiichi Nuclear Power Plant which managed to resist the consequences of the earthquake by successfully shutting down all operating units.Footnote 13 However, the ensuing tsunami led to the loss of power supply which subsequently obstructed the cooling of the three reactors at the Fukushima Daiichi nuclear plant.Footnote 14 Only one emergency diesel generator (6B) remained intact and it “provided emergency power for the units 5 and 6”.Footnote 15 Moreover, the instrumentation and control systems were also disabled by the tsunami, rendering repair work almost impossible. The absence of the cooling system quickly led to an explosion on site; the spent fuel pools began to leak and the radiological contamination spread into the environment.Footnote 16 Japan faced an unprecedented nuclear accident that was rated 7 on the INES scale.Footnote 17
II. The Convention On Nuclear Safety
The Convention on Nuclear Safety was adopted in Vienna in 1994, eight years after the Chernobyl accident.Footnote 18 It was the result of growing concern over the operation of “Chernobyl-type graphite reactors that continue to operate not only in Ukraine but also in Russia and Lithuania”.Footnote 19 It is considered to be an “incentive convention” prescribing general safety rules without directly interfering in the competence of the national regulatory bodies. This is underlined in its Preamble, which states that the “Convention entails a commitment to the application of fundamental safety principles for nuclear installations rather than of detailed safety standards”.Footnote 20 As is the case with many other conventions regulating civilian nuclear energy,Footnote 21 the rules of the NSC are heavily based “on the technical standards contained in the Safety Fundamentals by the IAEA in 1993”.Footnote 22 Although these standardsFootnote 23 are not considered to be binding and the NSC does not explicitly refer to them, some authors still believe states must comply with the standards since “they had undoubted influence on the regulation of nuclear risks at the national level and regulating nuclear facilities”.Footnote 24 The main objective of NSC is “to achieve and maintain a high level of nuclear safety worldwide through the enhancement of national measures and international co-operation including, where appropriate, safety-related technical co-operation”.Footnote 25 Since IAEA standards provide a detailed account of measures aimed at fulfilling this objective, they need to be relied upon in interpreting and implementing the NSC provisions.Footnote 26 These standards also provide indispensable guidance for states in complying with the convention, which requires prescribing of national safety standards. They also represent “an international consensus on what constitutes a high level of safety for protecting people and the environment from harmful effects of ionizing radiation”.Footnote 27 Due to all these reasons, they will be taken into consideration in assessing Japan's compliance with the NSC.
The NSC requires each contracting party to “take the appropriate steps to ensure the safety of nuclear installations”,Footnote 28 which necessitates that a country fulfils several obligations. The word “appropriate” may seem to be an unclear and rather unfortunate choice of word but the NSC represents a reflection of “internationally formulated safety guidelines”Footnote 29 which may change as safety standards evolve.Footnote 30 A contracting party shall, as its first obligation, “establish and maintain a legislative and regulatory framework to govern the safety of nuclear installations”Footnote 31 which is intended to cover the plant, equipment, materials, and personnel. The IAEA Safety Guide on the Governmental, Legal and Regulatory Framework for SafetyFootnote 32 provides a comprehensive checklist of issues to be prescribed by national legislationFootnote 33 and a list of competences and functions to be entrusted to the regulatory body.
The second obligation for a contracting party relates to the regulatory body “entrusted with the implementation of the legislative and regulatory framework”,Footnote 34 which includes the following four main activities: (1) authorization, (2) review and assessment, (3) inspection, and (4) enforcement. The regulatory body must not be charged with the promotion or utilization of nuclear energy.Footnote 35 Bearing in mind that the variety of issues to be regulated in the domain of civilian nuclear energy covers several multifunctional areas, the IAEA guide on the Governmental, Legal and Regulatory Framework for Safety encourages national regulatory bodies to co-operate with other relevant authorities:
The regulatory body shall make arrangements for analysis to be carried out to identify lessons to be learned from operating experience and regulatory experience, including experience in other States, and for the dissemination of the lessons learned and for their use by authorized parties, the regulatory body and other relevant authorities.Footnote 36
It is also worth mentioning the IAEA safety guide on the Organisation and Staffing of the Regulatory Body for Nuclear Facilities,Footnote 37 which provides recommendations for national authorities regarding the management and the organization of a national regulatory body.
Under the NSC general safety requirements, the contracting parties shall take appropriate steps to ensure the priority of safety,Footnote 38 adequate financial and human resources,Footnote 39 limitations of human performance,Footnote 40 quality assurance,Footnote 41 assessment and verification of safety,Footnote 42 radiation protection,Footnote 43 and emergency preparedness and response.Footnote 44 Taking into account the events that occurred prior and subsequent to the Fukushima accident, as well as the fact that the “prime responsibility for the safety of a nuclear installation rests with the holder of the relevant licence”,Footnote 45 provisions related to adequate resources, quality assurance, and emergency preparedness and response will be discussed in more detail.
The requirement to ensure adequate human resources involves the “provision of sufficient numbers of qualified staff with appropriate education, training and retraining for all safety-related activities in or for each nuclear installation, throughout its life”.Footnote 46 In the light of the IAEA standards, the personnel should possess capabilities and competences for all aspects of plant operation.Footnote 47 The obligation also entails their attitudes towards the safe functioning of the plant.Footnote 48 Operational safety is closely connected with the safety culture within a nuclear installation. Additionally, the IAEA published a safety standard on the Recruitment, Qualification and Training of Personnel for Nuclear Power Plants,Footnote 49 which lays out factors to be taken into account in ensuring effective and well-trained personnel within the plant. Safety culture is an additional safety requirement that is understood both as the obligation of a contracting party to ensure the priority of safety and as the obligation to ensure adequate human resources. The IAEA Fundamental Safety Principles interpret this prerequisite as the:
[I]ndividual and collective commitment to safety on the part of the leadership, the management and personnel at all levels; accountability of organisations and of individuals at all levels for safety; and measures to encourage a questioning and learning attitude and to discourage complacency with regard to safety.Footnote 50
No less important is the obligation of quality assurance that includes both the safety assessment before the construction and commissioning of a nuclear installation and throughout its life; as well as the regular analysis, surveillance, testing, and inspection of the physical state and the operation of a nuclear installation.Footnote 51
The obligation of emergency preparedness and response is one of the issues that was much discussed after the Fukushima accident. Under the Convention, each contracting party shall take appropriate steps to ensure that there are “on-site and off-site emergency plans which are routinely tested for nuclear installations and cover the activities to be carried out in the event of an emergency”.Footnote 52 The contracting party should also provide information for emergency planning and response to its own population and the competent authorities of the states in the vicinity of the nuclear installation.Footnote 53 In March 2002, the IAEA's Board of Governors approved the safety standards on Preparedness and Response for a Nuclear or Radiological Emergency, which “established the requirements for an adequate level of preparedness and response to a nuclear or radiological emergency in any State”.Footnote 54 Moreover, in 2007 the IAEA additionally published the safety guide on Arrangements for Preparedness and Response for a Nuclear or Radiological Emergency which should assist Member States in the application of the requirements on preparedness and response to a nuclear or radiological emergency,Footnote 55 as well as the Criteria for Use in Preparedness and Response for a Nuclear or Radiological Emergency, which provides generic criteria for preventive actions and other response actions.Footnote 56
Apart from these general safety requirements,Footnote 57 the NSC provides more detailed safety rules concerning the siting,Footnote 58 design and construction,Footnote 59 and operationFootnote 60 of installations. These rules on the safety of installations represent a major component of the NSC. Stricter rules apply to existing nuclear plants where “each contracting party shall take the appropriate steps to ensure that the safety of nuclear installations … is reviewed as soon as possible”.Footnote 61 The obligation will include, if possible, all reasonably practicable improvements and the shutdown of the plant if upgrading is not possible.Footnote 62
Concerning the siting, design, and operation, the IAEA provided states with numerous safety standards which “have been very influential and serve as important guidelines for most states in regulating their nuclear facilities”.Footnote 63 Those specific safety standards have been further clarified and described in several safety guides,Footnote 64 which apply both to existing (at the time when the Convention entered into force) and new power plants.
Unlike many other conventions, which have certain non-compliance mechanisms,Footnote 65 the NSC relies solely on review of national reports at periodic review meetings of contracting parties in order to resolve safety problems.Footnote 66 This raises questions about its efficient enforcement. Moreover, review is not carried out by independent experts as was recommended by the IAEA's own International Nuclear Safety Advisory Group, but by state officials. According to Kamminga “the Convention thereby fails to reflect the basic recommendation made by the IAEA's own International Nuclear Safety Advisory Group (INSAG) that the reviewers should be internationally recognized experts who are independent from the organisations directly responsible for the management of national nuclear safety programmes”.Footnote 67
III. Implementation of the Convention on Nuclear Safety and Iaea Standards in Japan
The Fukushima nuclear accident called for a re-examination of the safety rules prescribed by the NSC, as well as the safety standards developed by the IAEA. As the circumstances surrounding the catastrophe slowly come to light, it is worth analyzing the measures taken by the Japanese government to apply the NSC in order to assess its compliance with the Convention; notably the steps undertaken to implement certain NSC provisions concerning the regulatory body, safety culture, siting, design, and construction of the plant.Footnote 68 Although the NSC “seeks to pursue its objectives by enhancing national measures”,Footnote 69 the obligations embodied in the Convention, together with the IAEA's standards, provide sufficient guidance concerning the types of measures that need to be adopted. Moreover, the failure to adopt certain national measures may raise a question about the violation of the international obligation contained in the NSC.
A. Was NISA an Independent and Efficient Regulatory Body?
Under the NSC, each contracting party shall establish or designate a regulatory body, entrusted with the implementation of the legislative and regulatory framework, which will be independent from the body entrusted with the promotion of nuclear energy.Footnote 70 The establishment of such regulatory body both de jure and de facto has proven to be a difficult challenge for almost all contracting parties. Hence, the issue was discussed at several review meetings concerning the implementation of the NSC, especially at the third review meeting where the governments raised serious concerns regarding the independence and capabilities of national regulatory bodies in the light of austerity measures worldwide.Footnote 71
Following the reorganization of the Japanese central government in 2001, the Ministry of Economy, Trade, and Industry (METI) was given responsibility for the safety regulation of all nuclear energy facilities, while the Nuclear and Industrial Safety Agency (NISA) was established as a special organization integrated within METIFootnote 72 entrusted with the administration of nuclear safety regulations. Besides NISA, there were several other bodies with various competences within the field of nuclear energy: the Nuclear Safety Commission and the Atomic Energy Commission, both within the Prime Minister's Office.Footnote 73 The Japan Nuclear Energy Safety Organization was created in 2003 under the auspices of METI to provide infrastructure together with NISA to ensure the safe use of nuclear energy.Footnote 74
Even before the Fukushima accident there were serious concerns about the independence and efficiency of NISA and these became more pronounced and articulated following the catastrophe, especially through media coverage.Footnote 75 Moreover, these concerns raised the question of the compliance of the Japanese government with Article 8 of the NSC, which governs the establishment and competences of the national regulatory body, and the safety requirements prescribed by the IAEA safety guide on Organization and Staffing of the Regulatory Body for Nuclear Facilities.Footnote 76
Under Article 20 of the Act for Establishment of the METI,Footnote 77 NISA was exclusively in charge of ensuring “safety of nuclear and other energies and industrial safety”.Footnote 78 The Japanese national reports on the implementation of the NSC underlined the competences of NISA, which are intended to guarantee its independence and do not include the promotion of nuclear energy.Footnote 79 However, in several instances NISA was not only performing these tasks but was also engaged in the promotion of nuclear energy.Footnote 80 This practice also raises the question of a potential conflict of interest in NISA's work as a result of its competence to monitor the implementation of safety rules and its interest in promoting the use of nuclear energy in Japan. NISA's independence from the body promoting nuclear energy was additionally questionable due to the fact that NISA was an “agency of METI, the ministry in charge of promotion of nuclear energy”.Footnote 81 The Act for Establishment of the METI entrusts another METI agency, the Agency of Natural Resources and Energy, with the “promotion of appropriate utilisation of mineral resources and energy”.Footnote 82 This demonstrates the lack of proper separation of powers when it concerns the promotion of nuclear energy and the breach of the obligation prescribed by Article 8 of the NSC.
The effective delegation of powers to NISA is another issue to be addressed. It essentially requires “the delegation of regulatory powers to some agency distinct from the government itself”.Footnote 83 This requirement stems also from the obligation of a country to “establish a regulatory authority provided with adequate authority, competence and financial and human resources to fulfil its assigned responsibilities”.Footnote 84 According to Majone, this is a feature of modern public administration where the “rules are made and enforced by expert agencies operating at arm's length from government”.Footnote 85 However, in the case of NISA and METI, the Minister of METI has, inter alia, the authority to issue licences for the establishment of the nuclear installations and revoke them in cases of violations of the Reactor Regulation Act. The Minister may also pass ordinances on operational safety, technical standards, operation plans, and pre-service inspection,Footnote 86 while NISA at the time conducted “clerical works concerning the competence of the Minister of METI”.Footnote 87 This runs counter to the IAEA's requirements on legislative aspects of regulatory independence, which empower a “regulatory body to have the authority to take decisions, including decisions on enforcement actions”.Footnote 88
The other concern relates to the inefficiency of NISA in performing its duties, especially in overseeing the state of nuclear installations. In various national reports on the implementation of the NSC, the Japanese government explained NISA's response to certain incidents that occurred in nuclear power plants. Unfortunately, in most of the cases the response was belated and demonstrated a lack of trained staff within NISA and a lack of openness, raising concerns about the implementation of Article 11 of the NSC. The obligation of efficiency of the regulatory body in discharging its responsibilities and performing its functions was clarified by the IAEA's general safety requirements, which precisely entail the promotion of enhancements in safety, and the fulfilment of its obligations in an appropriate, timely, and cost-effective manner so as to build confidence.Footnote 89
TEPCO's falsification of self-controlled inspection records represents a very good illustration of NISA's inefficiency. In 2000, METI obtained information about falsified records and, immediately after the creation of NISA, entrusted it with the task of verifying these allegations.Footnote 90 Unfortunately, the records were not kept after a certain period of time and NISA's employees were unable to act promptly. Even though one may argue that NISA was a new institution within METI, the question remains as to why it took two years for NISA to disclose this information to the public.Footnote 91 The inefficiency of NISA was also evident during the Fukushima accident when this regulatory body demonstrated its inability to act in an emergency situation. The interim report of the independent investigation into the Fukushima disaster, led by Professor Hatamura Yotaro, concluded that NISA did not possess sufficient organizational capabilities and expert knowledge to deal with the consequences of the disaster and that it demonstrated a lack of transparency and independence in its actions,Footnote 92 which prompted the committee to recommend the strengthening of the regulatory body in its final report.Footnote 93 A good illustration is the failure of NISA to provide the SPEEDI (The System for Prediction of Environmental Emergency Dose Information) results to the public, which was an essential element in planning the prevention of radiation exposure and the evacuation of the local population.Footnote 94 A more demonstrative example is the failure of NISA to act upon TEPCO's safety evaluation report on the impact of a tsunami on the nuclear installation. This is examined below in relation to the implementation of the NSC provision on siting, design, and construction.
Doubts in relation to the establishment and functioning of NISA were expressed in a series of reports after the accident, which clearly demonstrates Japan's failure to comply with the NSC's obligation on the regulatory body. The Integrated Regulatory Review Service (IRRS) of the IAEA raised this concern in 2007 and made several recommendations to the Japanese government that were, unfortunately, not taken into account at the time.Footnote 95 A more critical assessment was contained in the Diet's report, where it was concluded that the “independence of the regulatory body from the political arena, the ministries promoting nuclear energy, and the operators was a mockery”.Footnote 96 The Commission stated that NISA lacked expertise, openness in decision-making, and commitment to ensuring safety. The Japanese government, in its report on the Fukushima accident, announced that there was a need to reinforce the safety regulatory bodies by separating NISA from METI and to review implementing frameworks, including the NSC and relevant ministries.Footnote 97 Media coverage suggested that NISA would be incorporated within the Ministry of Environment. This was finally carried out on 19 September 2012 with the establishment of the Nuclear Regulation Authority. This body replaced NISA and the Nuclear Safety Commission and constitutes a part of the Ministry of Environment. Time will show if this represents an adequate solution as a result of the ministry's competences in the promotion of clean energy, such as nuclear energy.Footnote 98 An additional challenge is the fact that the initial plan to phase out the use of nuclear energy by 2040 failed to receive the full support of the Japanese cabinet.Footnote 99
B. Safety Culture in the Nuclear Power Industry in Japan
The issue of safety cultureFootnote 100 was often on the agenda of meetings of the contracting parties to the NSC.Footnote 101 This component is considered to be essential for the proper implementation of the NSC provisions since it represents a precondition for the preparation and review of NSC safety standards within both the operating organization and the regulatory body. As it is emphasized by the IAEA guide on the Management System for Facilities and Activities safety requirements, the “management safety standards, incorporated into national legislation and regulations and supplemented by international conventions and detailed national requirements, establish a basis for protecting people and the environment”.Footnote 102
Even before the accident there were certain concerns about the lack of a safety culture within the operating organizations and national regulatory body in Japan.Footnote 103 Certain alarming allegations made in relation to TEPCO demonstrated not only the complete lack of a safety culture within the operator but a level of incompetence and collusion within the national regulatory body. Although TEPCO's falsification of self-controlled inspection records was certainly one of the most obvious examples, there were several others. One incident concerned the falsifying of a reactor containment leakage test that occurred in 1991 and 1992 that was revealed as late as 2002. Even more alarming was the fact that the inspection at the time was attended by inspectors of the national regulatory body.Footnote 104
Although the Japanese government, in its second national report of 2001, admitted that there was a need to reassess the management safety issue, it tried to justify the actions of the regulatory body with the “ambiguity of regulatory procedure on self-controlled inspection by license holders, lack of formulated acceptance criteria of cracks, and insufficient penalty for organizational illegal acts”.Footnote 105 This explanation is indicative of the failure of the Japanese government not only to establish and maintain a legislative and regulatory framework to govern the safety of nuclear installations as is prescribed by Article 7 of the NSC but also shows a lack of a safety culture. This criticism was finally confirmed in the Diet's report where the Independent Investigation Commission characterized the “cosy relationship between the operators, the regulators and academic scholars as totally inappropriate” and found that “it was far from being a safety culture” with frequent lobbying by the Federation of Electric Power Companies.Footnote 106 The Diet concluded by calling it “a regulatory capture in which the oversight of the industry by regulators effectively ceases”.Footnote 107
C. Were There any Deficiencies Related to the Siting, Design, and Construction of the Fukushima Daiichi Nuclear Power Plant?
Regarding new power plants, the NSC requires each contracting state to “take appropriate steps to ensure that appropriate procedures are implemented concerning the siting, design and construction and operation of the nuclear plant”.Footnote 108 As for existing power plants, the contracting parties shall take measures to carry out all practical improvements to upgrade the plants or, if not possible, to shut them down.Footnote 109 Although the NSC does not contain detailed obligations concerning the siting of a nuclear power installation, there are certain IAEA general and specific requirements for contracting parties to take into consideration. Since the Fukushima nuclear power plant dates from 1971, the rules on existing nuclear power plants apply first. However, the assessment of the existing plants also requires a contracting party to comply with all recent IAEA safety requirements, which are the results of evolving safety standards concerning the use of nuclear energy. Moreover, the assessment should be in the “form of critical self-assessments with outside assistance, peer reviews, or in-depth evaluations involving experts from other countries or international bodies”.Footnote 110
1. Siting of the plant
One of the obligations laid down by the Convention requires a party to evaluate all relevant site-related factors likely to affect the safety of a nuclear installation for its projected lifetime.Footnote 111 The choice of siting for any plant in Japan requires a very strict evaluation of the seismological and geological conditions in the region, as well as the engineering geological aspects and geotechnical aspects of the proposed site, as a consequence of Japan's geological structure. Japan represents a “weak and unstable segment of the earth's crust where readjustments of deep-lying rock masses are constantly occurring, resulting in hundreds of volcanoes and more than 1500 earthquakes shocks occurring annually”.Footnote 112 Moreover, being situated at the “boundaries of four tectonic plates: the North American, Eurasian, Pacific and Philippine Sea plates, the Japanese archipelago receives strong compression from two directions caused by subductions of the Pacific and Philippine Sea plates”.Footnote 113
As a result, the siting phase should involve the assessment of these external occurrences, primarily the impact of earthquakes and tsunamis occurring in the region. These requirements should also be applied when the conditions on design and construction were assessed and reassessed for existing nuclear installations. According to the IAEA's specific standards on Site Evaluation for Nuclear Installations, the country should first “collect pre-historical, historical and instrumentally recorded information and records, as applicable, of the occurrences and severity of important natural phenomena activities for the region that will be carefully analyzed for reliability, accuracy and completeness”.Footnote 114 A country should also assess the frequency and severity of any naturally induced event and phenomenon that could impact the safety of the plant.Footnote 115 In the case of countries such as Japan, the IAEA's specific site standards require not only the assessment of seismological and geological conditions in the region but also the phenomenon of water waves induced by earthquakes or other geological phenomena.Footnote 116 This involves evaluating the potential effect of tsunamis on the safety of a nuclear installation site, as these are a combination of geological and meteorological natural hazards and these represent separate natural phenomena. The fact that the contingency of a severe combination of external events was not anticipated in the design, operation, resourcing, and emergency arrangements was also criticized by the IAEA in its preliminary report subsequent to the Fukushima accident.Footnote 117 As will be shown below, both the regulatory body and the operator were also aware of the fact that the Fukushima Daiichi Nuclear Plant was not capable of withstanding the effects of the earthquake and the tsunami but tacitly approved of the existing situation.Footnote 118
The frequency of earthquakes in Japan led to the development of an extensive legislative framework and methodology governing seismic impacts on the siting and design of nuclear power plants. The Japan Meteorological Agency even developed its own seismic scale, known as the JMA Seismic Intensity Scale.Footnote 119 The Environmental Impact Assessment Act, the Reactor Regulation Law, and the Regulatory Guide for Reviewing Nuclear Reactor Siting Evaluation and Application Criteria are the main pieces of legislation governing the evaluation of all site-related factors.Footnote 120 However, in its preliminary report of June 2011, the IAEA reported that “Japan underestimated the tsunami hazard for several sites … Nuclear designers and operators should appropriately evaluate and provide protection against the risks of all natural hazards, and should periodically update these assessments and assessment methodologies in light of new information, experience and understanding.”Footnote 121 While the IAEA primarily criticized the estimation of a possible tsunami, there were also some concerns regarding defence against earthquakes.Footnote 122 These concerns question the compliance with the NSC provisions on siting and the applicable IAEA standards.
The Fukushima nuclear plant is located in the Fukushima prefecture that lies in the Tohoku Region of Honshu Island. It is a region that has frequently been affected by large tsunamisFootnote 123 and has also experienced major earthquakes followed by tsunamis that struck the Sanriku coast in 1896 and 1933. The reactors in the Fukushima plant were designed to withstand an earthquake up to magnitude 7.9 and tsunami waves of up to 5.7 metres. All the eleven reactors at four affected nuclear power plants operating at the time in the region shut down automatically when the earthquake occurred.
Despite the fact that the defence system against the earthquake did work in this instance, there are concerns about the methodology used for calculating the effects of the earthquakes. According to Geller, the estimation of earthquakes is based on flawed methods for long-term forecasts which follow the seismic-gap hypothesis conjectures that “zones where no large earthquakes have occurred for a while, dubbed ‘seismic gaps’, are ripe for imminent large events”.Footnote 124 By using this methodology, it was calculated that three regions—Tokai, Tonankai, and Nankai—represent the most dangerous zones of three hypothetical “scenario earthquakes”.Footnote 125 The same conclusion was reiterated in the Additional Report of the Japanese Government to the IAEA—Accident at TEPCO's Fukushima Nuclear Power Stations.Footnote 126 However, in the last 100 years no earthquakes occurred in any of these regions, but they have occurred in places designated as low probability regions. Geller adds that the right approach should have also factored in global seismicity and the historical record in Tohoku in estimating seismic hazards and gives examples of “five subduction-zone earthquakes of magnitude 9.0 or greater (Kamchatka 1952, Chile 1960, Alaska 1964, Sumatra 2004, Tohoku 2011)”.Footnote 127 In addition, the earthquakes with tsunamis that struck the Sanriku coast in 1896 and 1933 show the same pattern in Japan.
More worrying findings were presented in the Diet's report, which demonstrated NISA's and TEPCO's knowledge of weak plant structure that was unable to withstand a powerful earthquake.Footnote 128 NISA accepted TEPCO's interim anti-seismic back check report although “the scope of the assessment included the reactor building and only seven of many other important safety installations and equipment”.Footnote 129 The report was a response to the Nuclear Safety Commission guidelines and showed a need for many reinforcements to meet the standards of the new guidelines. Despite this finding, NISA subsequently approved the postponement of any future seismic checks until 2016.
With regard to the tsunami defence system, Geller points at the historical records for tsunamis, namely the “well-documented 1896 Sanriku tsunami with a maximum height of 38 metres causing more than 22,000 deaths and the 1869 Jogan tsunami documented to have had a height roughly comparable to, or perhaps slightly less than, that of the 11 March tsunami”.Footnote 130 Bearing in mind the obligation of a country to collect pre-historical, historical, and instrumentally recorded information and records, failure to act upon this knowledge would certainly alter the chain of events in the Fukushima case. Moreover, the responsible regulatory bodies also failed to properly organize the planning process in several instances when tsunami impact was assessed. In 2001, the Nuclear Safety Commission commenced the “revision process of the seismic design regulatory guide through its Sub-committee but no tsunami specialist was included”; this demonstrated a lack of awareness of the significance of tsunamis in nuclear safety.Footnote 131 Furthermore, after receiving TEPCO's safety evaluation report based on the “Tsunami Assessment Method for Nuclear Power Plants in Japan”, NISA failed to provide specific points or instructions for action.Footnote 132 This also occurred in September 2009 and March 2011 when NISA received TEPCO's results on evaluating the tsunami impact metrics.Footnote 133 In addition, the failure to calculate the accurate height of a potential tsunami also rests with the operator TEPCO. Although the initial licences for Fukushima Daiichi were “awarded in 1966 with the design base of 3.1 meters as the tsunami wave height above the sea level”,Footnote 134 subsequent testing led to the threshold being raised to a height of 5.7 metres.Footnote 135 In February 2002, the Tsunami Evaluation Subcommittee, established under the Nuclear Civil Engineering Committee and the Japan Society of Civil Engineers, compiled the tsunami evaluation methodology for estimating the maximum wave height of a tsunami based on existing historical records.Footnote 136 According to this methodology, TEPCO reassessed potential tsunami impact and concluded that the reactor should be capable of withstanding the impact of a tsunami exceeding 15 metres, but failed to take any steps in altering the existing line of defence. There were even some concerns that this methodology was “decided through an unclear process, and with the improper involvement of the electric power companies”, and that NISA accepted it “without examining its validity”.Footnote 137
Not only was the impact of a tsunami badly assessed, but the siting of the plant was modified to accommodate TEPCO's needs in the construction phase. Namely, the natural 35-metre seaside cliff was reduced to 5.7 metres, which was considered to be a sufficient height to withstand the projected force of a tsunami. After the Fukushima accident there was speculation regarding the reason for lowering the natural seawall. According to media reports, it was partly done to facilitate the transport of equipment to the site and the pumping of seawater to the reactors.Footnote 138 The other reason concerned the potential impact of earthquakes, since it was estimated that the reduction of the seawall would be an “efficient way to build the complex atop the solid base of bedrock needed to better protect the plant from earthquakes”.Footnote 139 Even though this may seem a reasonable decision at the time, it is evident now that the environmental impact assessment was not properly carried out.
In addition, it raises the question of whether the environmental, seismic, and meteorological events were properly taken into account, not only during the design and construction of the plant, but also throughout the life-cycle of the plant.Footnote 140 As was pointed out in the arbitration proceedings in the Mox Plant Case:
[T]he objectives of a proper environmental assessment are, inter alia, to ensure that the activities comply with the applicable international environmental obligations, to ensure that appropriate protective and response measures may be taken, to ensure that alternative proposals have been fully considered, and to ensure that interested parties and concerned States are fully informed of the environmental implications of the project.Footnote 141
Furthermore, this runs counter to the obligation of the party under the NSC to re-evaluate the likely safety impact of all relevant site-related factors on individuals, society, and the environment.
2. Design and construction of the plant
There were serious concerns about improvements to the plant that were obliged to be done in accordance with Article 6 of the NSC concerning existing nuclear installations and Article 18 concerning the design and construction of the installation. Likewise, compliance with the relevant IAEA's standards on power plant design,Footnote 142 the design of the reactor coolant system,Footnote 143 the design of reactor containment systems for nuclear power plants,Footnote 144 and the design of the reactor core was also questionable.Footnote 145 Several issues were raised by both the international experts and the representatives of the Japanese government concerning the design and construction of the installation. Inadequate defence in depth, the design of fuel ponds, the loss of power supply, and an inadequate cooling system were some of the major deficiencies identified in the design of the nuclear installation. Moreover, the media again speculated about the failure of TEPCO to improve Units 1–5 at the Daiichi installation, although General Electric, which designed the initial boiling water reactors,Footnote 146 known as the Mark 1 containment, offered a “reactor with a sleeker design—the Mark II”.Footnote 147 This refusal was considered to be in gross violation of Article 6 of the NSC, which prescribes the strict obligation of contracting parties to improve existing nuclear installations.
A major criticism concerns the design of the reactor coolant system, which should, as prescribed by the NSC, provide reliable levels and methods of protection. This obligation is further clarified and explained in the IAEA's standards on Reactor Coolant System and Associated Systems. This safety guide requires the operator to provide the appropriate “emergency power supply as necessary to components that are needed for system actuation or operation”.Footnote 148 Moreover, the “emergency core cooling system should be designed to ensure that enough coolant is available for adequate long term core cooling”.Footnote 149 As a rule, the backup power is supplied from on-site emergency diesel generators that provide electricity. Unfortunately, in the Fukushima accident, the loss of the backup power system and the flooding of the seawater pumps caused by the tsunami was the result of an additional design flaw. Since it was estimated that the tsunami waves would not be higher than 5.7 metres, the seawater pumps and the emergency diesel generators and switchboards installed in the basement floor of the reactor buildings and the turbine buildings were placed at heights ranging from 0 to 5.8 metres.Footnote 150 When the tsunami struck, except for the one diesel generator in Unit 6 which was placed at a higher altitude, the rest were immediately submerged. Although the assessment from 2002—based on the Tsunami Assessment Method for Nuclear Power Plants in Japan and proposed by the Japan Society of Civil Engineers—showed that the maximum water level would be 5.7 metres, TEPCO only raised the height of the seawater pump installation and diesel generators in Unit 6 in response to that assessment.Footnote 151 The lack of power supply subsequently led to the overheating of the reactor cores and the spent fuel pools. Seawater was used as an alternative coolant for the spent fuel pools.
As a result of the failure to implement the defence-in-depth requirementFootnote 152 prescribed by Article 1(ii) of the NSC, loss of power supply occurred. Both the report of the IAEAFootnote 153 and the report of the Japanese governmentFootnote 154 identified that defence in depth was not developed for extreme events such as an earthquake followed by a tsunami. The IAEA guide on the Safety of Nuclear Power Plants—DesignFootnote 155 differentiates five layers of defence in depth whereby the fourth level of defence was the weakest in the case of the Fukushima accident. The fourth level of defence should address “severe accidents in which the design basis may be exceeded and to ensure that radioactive releases are kept as low as practicable … The most important objective of this level is the protection of the confinement function.”Footnote 156 Regrettably, the Fukushima nuclear power plant did not possess an adequate fourth level and experienced problems in the operability of the containment venting system in the face of a severe accident. As was stated in the report of the Japanese government subsequent to the accident, “the primary containment vessel (PCV) was not equipped with a filter with sufficient radiation decontamination capability that will enable ventilation facilities to prevent an explosion in the nuclear reactor building due to hydrogen leakage from the PCV”.Footnote 157 In addition, the water containing dissolved radioactive materials that were released from inside the Reactor Pressure Vessel (RPV) leaked into the PCV and accumulated inside the reactor buildings and the turbine buildings.Footnote 158 In time, the radioactive water was released into the sea.
The question of cooling and supplying water to the spent fuel pool was also discussed in relation to the Fukushima power plant design. The accident initiated a re-examination of the NSC and the IAEA requirements regarding the design of the coolant system for the spent fuel pools. As was stated at the briefing before the US Senate, “one of the core areas of concern and potential future action has to do with backup power with spent fuel rod pools and in particular with battery power capacity”Footnote 159 which needs to be increased for longer than four or eight hours. This was the battery lifespan in the case of Fukushima power plant. Finally, the actual location of the spent fuel at the higher part of the reactor building was another issue to examine in future. It remains to be seen whether spent fuel pools at ground level would facilitate the response to severe accidents.
During the briefing before the Committee on Energy and Natural Resources of the United States Senate, the issues of fuel pools design and the inadequate cooling system for the pools were raised. This discussion again reiterates the importance of this safety requirement. According to American nuclear energy experts, one of the issues to be addressed is the optimization of the “ways to fill the spent fuel pool and keep water injected into the reactor vessel to keep the core cool”.Footnote 160 The experts also pointed out the need to reconsider the storage of fuel rods in the pool. They also recommended that the spent fuel rods stored in pools on site should be “arranged to place old, cool fuel rods next to newer hotter rods to prevent hot spots and fires in the event that the pools lost enough water to cover the rods”.Footnote 161 According to the World Nuclear Association, “reactor unit ponds (2 & 4) were unusually full”,Footnote 162 while the pond at the Unit 4 also held a full core load of 1,535 fuel assemblies.Footnote 163
D. The Quality of the Emergency Response
The primary state obligation in relation to the emergency response is to ensure that “on-site and off-site emergency plans are functioning in the case of an emergency” and to “provide its own population and the competent authorities of the States in the vicinity of the nuclear installation with appropriate information for emergency planning and response”.Footnote 164 The off-site emergency plans that—according to the NSC and the IAEA Safety Standards on Preparedness and Response for a Nuclear or Radiological Emergency—should be prepared and routinely tested did not adequately function after the accident. The investigation committee identified several reasons that led to the evacuation of the off-site centre:
[D]ifficulty in assembling its staff members due to damaged transportation and heavily congested traffic caused by the earthquake; loss of telecommunication infrastructures, power cut, shortages of food, water and fuel; and elevated radiation levels in the building which was not equipped with air cleaning filters.Footnote 165
Emergency preparedness and response after the accident was rather poor. This deficiency was identified in the IAEA's preliminary report after the Fukushima accident,Footnote 166 the Additional Report of the Japanese governmentFootnote 167 of June 2011, the interimFootnote 168 and final reportFootnote 169 of the investigation committee set up by the Japanese government, and the Diet's report.Footnote 170 Both the governmental authorities and TEPCO's staff failed to fulfil this obligation in an emergency environment of both a large-scale natural disaster and a nuclear accident.Footnote 171 None of these bodies acted as planned due to the fact that the system was not designed to sustain such extreme natural circumstances.Footnote 172
As soon as the state of nuclear emergency was declared, the Prime Minister established the Nuclear Emergency Response Headquarters (NERH) and the Local Nuclear Emergency Response Offices, which experienced serious difficulties in their work. Communication between the NERH and the local offices, as well as between the NERH and NISA and other relevant governmental bodies, was impeded due to the lack of communication tools. Moreover, there were concerns about the delegation of powers between the NEHR and the local offices.Footnote 173 The emergency response was also aggravated by disruption in the official communication flow between TEPCO, NISA, and the Prime Minister's Nuclear Emergency Response Headquarters, where TEPCO, contrary to emergency rules, had to simultaneously inform both bodies.Footnote 174 Furthermore, information collected by SPEEDI on the discharge of radioactive materials was neither disclosed to the public nor adequately utilized by the Ministry of Education, Culture, Sports, Science, and Technology, the competent ministry for SPEEDI.Footnote 175 The absence of this information also influenced the decision-making process concerning the evacuation of residents.Footnote 176 The investigation committee set up by the government also highlighted the insufficient and incomplete information regarding the “status of the reactor cores, the critical conditions of Unit 3, and explanations on radiation effects on health such as ‘No immediate impacts on human health’”.Footnote 177 TEPCO's officials also failed to provide adequate information about the situation in the nuclear installations.Footnote 178 Moreover, some senior managers failed to return to Tokyo hours after the earthquake occurred.Footnote 179
Likewise, the information was not provided to the states in the vicinity and the wider international community was not informed in a timely manner about the decision of the Japanese government to release contaminated water into the sea. The notification was sent several minutes after the discharge commenced, while the embassies of the People's Republic of China, South Korea, and Russia were informed of the impact of the discharge two days after the discharge began.Footnote 180 The other illustration was the inability of the International Affairs Office of the Policy Planning and Coordination Division of NISA to promptly inform neighbouring countries on all the aspects of the nuclear accident due to the fact that it lacked staff in the Emergency Response Centre (ERC) of METI.Footnote 181 One could question whether this may be considered as a breach of an international obligationFootnote 182 prescribed by the 1986 Early Notification Convention,Footnote 183 which requires a state party in cases of a nuclear accident to:
[F]orthwith notify, directly or through the International Atomic Energy Agency, those States which are or may be physically affected as specified in Article 1 and the Agency of the nuclear accident, its nature, the time of its occurrence and its exact location where appropriate.Footnote 184
IV. Response of the International Community to the Fukushima Accident
Following the immediate aftermath of the disaster and by the time various investigation committees gathered necessary information about the accident, the 2nd Extraordinary Meeting of the Contracting Parties to the Convention was held in August 2012. The objective of the Convention was to “review and discuss lessons learned so far from the accident at TEPCO's Fukushima Daiichi nuclear power plant, to review the effectiveness of the provisions of the Convention” and to provide appropriate recommendations.Footnote 185 The six main issues addressed at the meeting (which correspond with those raised in this article) concerned external events, design issues, severe accident management and recovery (on-site), national organizations, emergency preparedness and response and post-accident management (off-site), and international co-operation.Footnote 186
The outcome of the meeting was encouraging and it indicated an international agreement to revisit the NSC. As a first step, the contracting parties discussed the proposals to amend several important guidelines such as the Guidelines Regarding the Review Process Under the Convention on Nuclear Safety,Footnote 187 Guidelines Regarding National Reports Under the Convention on Nuclear Safety,Footnote 188 and the Convention on Nuclear Safety: Rules of Procedure and Financial Rules.Footnote 189 Moreover, parties discussed a set of action-oriented objectives for strengthening nuclear safety based on the lessons learned from the Fukushima accident.Footnote 190 Those objectives recognized the need to reinforce compliance with the NSC, especially with regard to the independence and functioning of national regulatory bodies and the importance of IAEA standards in complying with the NSC. The contracting parties unequivocally recommended strengthening the independence, efficiency, and effectiveness of regulatory bodies that have to be able to decide independently on the basis of scientific and technological knowledge.Footnote 191 Furthermore, the idea of an international peer review of the regulatory framework governing the safety of nuclear installations, if the contracting party has an operating nuclear installation, was endorsed.Footnote 192 The significance of IAEA standards was also a point of agreement between the parties and it was recommended that parties “take into account the IAEA Safety Standards in enhancing nuclear safety”Footnote 193 and “inform how they intend to take the IAEA Safety Standards into account in implementing the NSC”.Footnote 194 Another one of the main achievements is the establishment of the working group, open to all contracting parties, which is tasked with “reporting to the next review meeting on a list of actions to strengthen the NSC and on proposals to amend, where necessary, the Convention”.Footnote 195
More specific recommendations that are in line with Kamminga's view on the need for expert review as a supervisory tool were made by the Swiss Confederation and the Russian Confederation. Both contracting parties also recognized the importance of international peer review missions involving external experts from other contracting parties, which can play an important role in achieving and maintaining a high level of nuclear safety. Although this is not a binding obligation, it is promising to see that on this occasion the Swiss Confederation proposed several amendments to the NSC, including, inter alia, amendments to Articles 8, 14, 17, 18, and 19. Interestingly, all proposed amendments concern NSC obligations that Japan failed to meet. In regard to the work of the regulatory body, the Swiss Confederation proposed periodic review of the regulatory body by external experts with regard to its compliance with the requirements of the IAEA. This also applies to the design, construction, and operation of the installation. Bearing in mind the importance of taking into account the development of relevant technical standards, the Swiss Confederation proposed the amendment of Articles 14 and 17, whereby the assessment and verification of safety and the revaluation of siting is to be carried out in accordance with state-of-the-art science and technology and other significant new safety information.Footnote 196
The proposal of the Russian Federation was more explicit and included “taking into account IAEA safety standards” in relation to Article 14 on the assessment and verification of safety, which would finally resolve the doubt about the legally binding nature of these standards. This recommendation, in line with the argument about the importance of IAEA safety standards in assessing compliance with the NSC, is reflected in the recognition of the technical and scientific support organizations, and continuous development of the IAEA safety standards in the light of the Fukushima accident, as well as encouragement for contracting parties to take IAEA safety standards into account in enhancing nuclear safety.
Most of the recommendations were accepted by the Japanese government, which undertook extensive institutional and legislative reform which, inter alia, included the establishment of the Nuclear Regulation Authority and the training of staff, and amending the Reactor Regulation Act, including legislation on external eventsFootnote 197 and severe accident measures, as well as strengthening the safety culture at all levels. The Japanese government also recognized the need to develop domestic standards and rules consistent with international standards, especially the IAEA standards, and to have frequent IAEA international peer review missions.Footnote 198 Likewise, in July 2011 NISA requested a stress test to be conducted on all Japan's nuclear power plants in line with the efforts of the EU to verify the safety of its own plants. This development should improve the understanding of the current safety of all nuclear installations in Japan.
V. Conclusion
The Convention on Nuclear Safety always generated a certain ambivalence due to the vagueness of its provisions, which require subsequent adoption of national measures, and its poor enforcement mechanism. Kamminga considers it to be a disappointing convention which:
[C]ontains neither the precise standards of the Convention on the Transboundary Effects of Industrial Accidents, the flexible amendment and gentle non-compliance procedures of the Montreal Protocol on Substances that Deplete the Ozone Layer, nor the incentive provisions of the Convention on Climate Change.Footnote 199
Despite this lack of specific and detailed rules prescribed by the NSC, it still contains obligations for contracting parties that are to be implemented in respect of both existing and new nuclear installations. It may be questionable what kind of obligation it raises for states as only “specific obligations resulting from treaties impose upon the contracting States the obligation to take the necessary measures through exercising due diligence in order to prevent the nuclear damage, either by prohibiting or by regulating such activities”.Footnote 200 Bearing in mind the need to clarify rules contained in the NSC, the IAEA developed various safety installation standards that cover all areas governed by the Convention. Although they are not binding, they provide sufficient technical guidelines for contracting parties in developing required national measures. The IAEA nuclear safety standards are considered to be the “cornerstone for an international nuclear safety and security mechanism which provides the basis for states to perform their duties relating to nuclear safety”.Footnote 201 Furthermore, the obligation of the installation state to “establish and maintain a legislative and regulatory framework to govern the safety of nuclear installations”Footnote 202 stems from both the principle of due diligence and the principle of prevention of environmental damage.Footnote 203 In addition, the NSC prescribes the party's obligation to ensure that each licence-holder meets its responsibility.
The Fukushima nuclear accident raised questions about the implementation of the Convention by the Japanese government and identified the need to reassess the obligation of each contracting party deriving from the NSC provisions in the light of lessons learned from the accident. Several major deficiencies, such as the lack of independence of the regulatory body from the body entrusted with the promotion of nuclear energy and its ineffectiveness in dealing with severe accidents, may demonstrate the failure of the Japanese government in exercising the obligation of due diligence. Moreover, serious oversight in evaluating all relevant site- and design-related factors, the design and construction of the installation, and effectively responding to the emergency additionally validate the argument about the lack of due diligence. This obligation involves the responsibility of a state to ensure the safe operation of all nuclear installations in the country through licensing, assessment and verification of safety, quality assurance, and the development of emergency plans and procedures, regardless of the fact that the plant was operated by a private company. Moreover, Japan's failure to inform countries in the vicinity that were likely to be affected by the ongoing nuclear accident about the release of the radioactive materials into seawater may also raise questions about meeting its international obligation towards these countries.Footnote 204
This catastrophic accident also reiterated the importance of the due diligence principle in regard to the question of compliance with the Convention on Nuclear Safety and the IAEA safety standards. As was stated in the Pulp Mills Case,Footnote 205 the due diligence obligation represents “an obligation which entails not only the adoption of appropriate rules and measures, but also a certain level of vigilance in their enforcement and the exercise of administrative control applicable to public and private operators, such as the monitoring of activities undertaken by such operators”.Footnote 206 Since these rules and measures must be “in accordance with applicable international agreements” and “in keeping, where relevant, with the guidelines and recommendations of international technical bodies”,Footnote 207 it becomes evident that Japan breached its due diligence obligation by failing to comply with the NSC and the relevant IAEA standards. This obligation would particularly require Japan to follow the technical standards developed by the IAEA, which ensure the NSC's “objective of securing the safe use of nuclear energy”.
As after the Chernobyl disaster, these claims may encourage academic discussion on state responsibility for nuclear damage, although there are very few precedents in relation to this issue. The existence of both elements of state responsibility for a wrongful act involving the breach of an international obligation of the state and the attribution of the conduct to the state were demonstrated in relation to several NSC provisions. However, the fact remains that so far no states have raised the question of Japan's state responsibility for nuclear damage, which can be explained by several reasons. Authors agree that one of the main reasons that may explain this is the absence of state practice.Footnote 208 So far only the claim in the case of the Cosmos 954Footnote 209 crash can be distinguished. Some authors also point out the case of the Japanese fisherman, although it involved the payment of compensation without the US admitting legal responsibility.Footnote 210 Perhaps a more convincing reason is the tacit solidarity between states, especially those who are extensive users of nuclear energy. As Guruswamy points out, “it is perfectly feasible that states declined to prefer claims for fear of establishing precedents that could be used against them”.Footnote 211 Finally, more successful international private law mechanisms channelled through the notion of civil liability may explain the behaviour of states in cases of a nuclear damage.Footnote 212
The accident exposed the ineffectiveness of the Convention's preventive monitoring mechanisms; a stronger monitoring regime would seem indispensable in preventing another Fukushima. This could be rectified by the introduction of expert peer review, as suggested by Kamminga, or by amending the NSC provisions.Footnote 213 In the aftermath of the Chernobyl disaster, states felt ready to adopt the NSC in an effort to provide the legislative and regulatory framework for the safety of nuclear installations. This latest nuclear incident motivated states to reconsider existing safety rules and render them more precise and detailed. At the 2nd Extraordinary Meeting of the Contracting Parties to the NSC,Footnote 214 the contracting parties made several suggestions which demonstrated their willingness to improve the effectiveness of the Convention. The proposals to introduce external expert review, the assessment and verification of safety in accordance with state-of-the-art science and technology and the IAEA standards reiterated the need to revisit the Convention and to further develop the IAEA standards and use them in assessing compliance with the NSC. However, time will tell if the contracting parties are ready to do what is needed to achieve the Convention's objective of ensuring a high level of nuclear safety worldwide.