Hostname: page-component-74656f9884-g96k6 Total loading time: 0 Render date: 2026-11-10T10:11:43.726Z Has data issue: false hasContentIssue false

Quantifying the predictability of the timing of jökulhlaups from Merzbacher Lake, Kyrgyzstan

Published online by Cambridge University Press:  10 July 2017

Jonathan Kingslake
Affiliation:
Department of Geography, University of Sheffield, Sheffield, UK E-mail: jonngs@bas.ac.uk
Felix Ng
Affiliation:
Department of Geography, University of Sheffield, Sheffield, UK E-mail: jonngs@bas.ac.uk
Rights & Permissions [Opens in a new window]

Abstract

Glacier-dammed lakes can yield subglacial outburst floods (jökulhlaups) repeatedly. Predicting flood timing is crucial for hazard mitigation, but incomplete understanding of flood-initiation physics makes this challenging. Here we examine the predictability of the timing of jökulhlaups from Merzbacher Lake, Kyrgyzstan, using five flood-date prediction models of varying complexity. The simplest model, which offers a benchmark against which the other models are compared, assumes that floods occur on the same date each year. The other four models predict flood dates using a flood-initiation threshold approach and incorporate weather forcing (approximated by the output of two climate reanalyses) behind the meltwater input to the lake; the most complex of these models accounts for a moving subglacial water divide beneath the glacier that dams the lake. Each model is optimized against recorded flood dates to maximize its prediction ability. In terms of their flood prediction ability, our two best models are those that assume a variable outburst threshold governed by the rate of meltwater input to the lake and the rate of lake-level rise. They excel over the simplest and most complex models and correctly predict flood dates to within ±20 days 57.4% of the time. We also quantify the impact of weather uncertainty on prediction success. Our findings can inform practical flood-forecasting schemes and future investigations of flood-initiation physics.

Information

Type
Research Article
Copyright
Copyright © International Glaciological Society 2013
Figure 0

Fig. 1. The Merzbacher jökulhlaup system. (a) Map of Merzbacher Lake and North and South Inylchek Glaciers; inset shows the system’s location in the Tien Shan. (b, c) Schematic lake and glacier cross-sections along a possible subglacial flood path (b) while the lake is filling and (c) when lake water depth h reaches the threshold hc and a flood initiates.

Figure 1

Table 1. Flood record of Merzbacher Lake for the period 1956–2008, showing the dates of peak discharge of 54 floods and the measured volumes of 19 floods. Of these 19 flood volumes, the 13 shown in bold are considered more reliable. Entries 1–51 come from Ng and Liu (2009), and entries 52–54 from Liu Shiyin (personal communication, 2009). The table omits a small subsidiary flood which emanated from the lake when it was nearly empty around 4 August 2005, which followed closely the flood in entry 51 and probably occurred because the ice dam did not ‘re-seal’ completely after the main flood. The reconstructed flood volumes are calculated from the two temperature forcings TNCEP and TERA using the method described in Section 3.4

Figure 2

Fig. 2. (a) ‘Real’ scheme and (b) ‘Simple’ scheme of application of weather forcing in our models. In both (a) and (b), upper and lower plots show, respectively, the history of the temperature forcing used to calculate the lake water supply Qi and the corresponding history of the simulated lake depth h. (a) The Real scheme calculates Qi using archived daily temperature data on all days before the day on which the prediction is made, D, and using forecasted temperature on all days after D. (b) The Simple scheme calculates Qi using archived daily temperature data throughout the prediction run. In both schemes, a flood is predicted when h reaches the outburst threshold hc, and E denotes the prediction error.

Figure 3

Table 2. Values of parameters kand T0 of the lake water supply sub-model, derived using a nonlinear multivariate regression that fits Eqn (2) to 13 measured lake volumes (Table 1). Parameters are derived separately for the two temperature forcings, TNCEP and TERA

Figure 4

Fig. 3. Comparison of 19 measured flood volumes with flood volumes reconstructed by integrating the lake water supply sub-model forced by (a) TNCEP and (b) TERA reanalysis temperature data. (c) Comparison between the flood volumes reconstructed using these temperature forcings. In (a) and (b), crosses display these comparisons for the 13 flood volumes used in deriving this sub-model’s parameters (Table 2), and ellipses display these comparisons for 6 additional flood volumes (Section 3.3). The vertical and horizontal size of crosses and ellipses indicate the error in the reconstructed and measured flood volumes

Figure 5

Fig. 4. Probability distributions of flood volumes and timing. (a) Percentage of jökulhlaups from Merzbacher Lake whose reconstructed volumes are <VF. (b) Probability of a flood having occurred before time t, given the modelled lake water supply between floods 3 and 4. The results in both (a) and (b) derive from modelling where TNCEP temperature data have been used to calculate the lake water supply. Dotted lines indicate upper and lower bounds on the volumes and probabilities based on the errors in Figure 3. The dates of floods 3 and 4 (7 September 1957 and 24 November 1958) are marked by the vertical dashed lines. A, A′, B, B′, C and C′ label the vertical guides described in Section 3.4.

Figure 6

Table 3. Summary of our five flood-date prediction models

Figure 7

Fig. 5. Prediction errors obtained by running the Constant Date (CD) model with two different values of the model parameter, Δ = 268 days and Δ = 216 days. (a) Prediction errors for each day of the study period, (b) error frequency histograms and (c) the percentage of prediction errors within the tolerance n.

Figure 8

Fig. 6. Dependence of two measures of prediction success, P20 and RMS, on the parameter Δ in the CD model. P20 is maximized with Δ = 216 and RMS minimized with Δ = 268. (The results in Figure 5 are based on these parameter values.)

Figure 9

Fig. 7. Example of a Constant Threshold (CT) model prediction run made with the ‘Real’ weather-forcing scheme. On day D (2 July 1957), the forecaster attempts to predict the date of flood 3 (7 September 1957) by simulating histories of (a) lake-water supply rate and (b) lake depth. The lake-water supply model is forced with TNCEP daily temperature data on those days preceding D, and forced with the multi-year mean value of TNCEP afterwards. With the outburst threshold hc = 86m, the flood-date hindcast is found to be 19 August 1957, and the corresponding prediction error is E = + 19 days.

Figure 10

Fig. 8. Dependence of the prediction success of the Constant Threshold (CT) model, as quantified by (a) RMS error and (b) P20, on the threshold value hc. Solid and dashed lines correspond to results obtained using the TNCEP and TERA weather forcings respectively.

Figure 11

Table 4. Results from nine sets of model runs using the ‘Real’ weather-forcing scheme. For each of our five prediction models, model parameters are optimized to minimize RMS and maximize P20. The CT, VTh, VTT and DM models are optimized separately for each temperature forcing, TNCEP and TERA. Displayed in columns 3–8 are the optimal model parameters and the RMS and P20 they yield

Figure 12

Table 5. Results from nine sets of model runs using the ‘Simple’ weather-forcing scheme, where archived weather is used throughout each prediction (see Section 2). The layout is identical to that of Table 4

Figure 13

Fig. 9. The variation of prediction success (as quantified by P20) with the predicted time before the next flood, N, for three models: the Constant Date (CD) model, the Variable Threshold model VTh with TERA temperature forcing, and the Variable Threshold model VTT with TNCEP temperature forcing