Hostname: page-component-74656f9884-8r8nv Total loading time: 0 Render date: 2026-11-07T10:54:04.581Z Has data issue: false hasContentIssue false

Cost-benefit break down: unplannable spaces in 1970s Glasgow

Published online by Cambridge University Press:  26 April 2018

SARAH MASS*
Affiliation:
1029 Tisch Hall, 435 S. State St, Ann Arbor, MI, USA48109
Rights & Permissions [Opens in a new window]

Abstract

This article examines a moment of uncertainty in early 1970s Glasgow motorway history: the planning of the East Flank of the Inner Ring Road and the potential removal of the Barrows Market. As sociological influences against wholesale urban clearance came into maturity in planning and community action, Glasgow planners carried out a feasibility study into the socio-economic costs of uprooting the commercial life of the Barrows. I suggest that reading this technocratic document for its cultural assumptions, ambiguities and tensions, rather than its engineering vision, opens up a different approach to the history of motorway planning.

Information

Type
Research Article
Copyright
Copyright © Cambridge University Press 2018 
Figure 0

Figure 1: 1960s model of the Inner Ring Road with CDAs. T. Hart, The Comprehensive Development Area (Edinburgh, 1968), 32. Reproduced with the permission of Tom Hart.

Figure 1

Figure 2: Clockwise from top left: ‘The Barrows on a weekday’; ‘The Barrows on a weekend’; ‘The Barrows on a Sunday’. Mansley, Glasgow East Flank, 12–13. Reproduced with the permission of University of Strathclyde Special Collections and Glasgow Council.

Figure 2

Figure 3: NGS News, 5 (1973–74). Reproduced with the permission of the New Glasgow Society.