Hostname: page-component-74656f9884-8r8nv Total loading time: 0 Render date: 2026-11-07T21:21:28.677Z Has data issue: false hasContentIssue false

The Performance of a Tunnel Bow Thruster with Slow Speed Ahead: A Revisited Issue

Published online by Cambridge University Press:  07 October 2009

Santiago Iglesias Baniela*
Affiliation:
(Universidad de La Coruña, Spain)
*
Rights & Permissions [Opens in a new window]

Abstract

This paper studies the effectiveness of a ship's tunnel bow thruster with slow speed ahead. After describing the general reasons for the decrease of performance with slow speed ahead, the Anti Suction Tunnel (AST) is analyzed as an advisable state-of-the art design option that aims to improve performance.

Information

Type
Research Article
Copyright
Copyright © The Royal Institute of Navigation 2009
Figure 0

Figure 1. Small turning moment of the tunnel bow thruster with straight speed ahead. Drawing: author.

Figure 1

Figure 2. Increase of tunnel resistance as a result of energy absorption of a twin vortex generated on the tunnel exit side where an expansion of the jet surrounding those vortices is produced. Drawing: author.

Figure 2

Figure 3. Different fields of pressure around a tunnel bow thruster with slow speed ahead. Drawing: author.

Figure 3

Figure 4. Typical grid construction for a tunnel thruster. Drawing: author.

Figure 4

Figure 5. Left: A typical tunnel bow thruster with a protection grid and a conical fairing at the aft part (source http://en.wikipedia.org). Right: A modern protection grid with a hull-thruster sharp transition (source: author).

Figure 5

Figure 6. Sketch of a tunnel bow thruster and an AST with slow speed ahead, showing the pressure fields and the active and passive water-jet effect generated when the thruster is pushing to port. Drawing: author.

Figure 6

Figure 7. Sketch of a tunnel bow thruster and an AST with speed astern, showing the pressure fields and the active and passive water-jet effect generated when the thruster is pushing to port. Drawing: author.

Figure 7

Figure 8. Uncorrected results of a turning test in a model test with and without AST of a twin screw ferry with a single bow thruster. Source: Brix, J., Manoeuvring Technical Manual. Drawing: author.

Figure 8

Figure 9. The tanker “Polar Endeavour” (ex “Arco Endeavour”) showing the bow thruster with an AST (a 2207 kW thruster of 2·4 m diameter with a 0·8 m diameter AST). Photograph: author.