Hostname: page-component-74656f9884-j7cmm Total loading time: 0 Render date: 2026-11-08T06:49:55.001Z Has data issue: false hasContentIssue false

USE OF THE PAR(p) MODEL IN THE STOCHASTIC DUAL DYNAMIC PROGRAMMING OPTIMIZATION SCHEME USED IN THE OPERATION PLANNING OF THE BRAZILIAN HYDROPOWER SYSTEM

Published online by Cambridge University Press:  12 December 2005

M. E. P. Maceira
Affiliation:
Electric Power Research Center, CEPEL, Rio de Janeiro, Brazil, and, Rio de Janeiro State University, UERJ, Rio de Janeiro, Brazil, E-mail: elvira@cepel.br; damazio@cepel.br
J. M. Damázio
Affiliation:
Electric Power Research Center, CEPEL, Rio de Janeiro, Brazil, and, Rio de Janeiro State University, UERJ, Rio de Janeiro, Brazil, E-mail: elvira@cepel.br; damazio@cepel.br
Rights & Permissions [Opens in a new window]

Abstract

In September 2000, the Brazilian system dispatch and spot prices were calculated twice, using different inflow forecasts for that month, as in the last 5 days of August the inflows to the reservoirs in the South and Southeast regions changed 200%. The first run used a smaller forecasted energy inflow and the second used a higher energy inflow. Contrary to expectations, the spot price in the second run, with the higher energy inflow, was higher than the one found in the first run. This paper describes the problem, presents the special features of the PAR(p) model that allow the described behavior, and shows the solution taken to avoid the problem.

Information

Type
Research Article
Copyright
© 2006 Cambridge University Press
Figure 0

Brazilian subsystems.

Figure 1

PAR(p) Coefficients of the Southeast Subsystem

Figure 2

Operation Dispatch Parameters

Figure 3

February PACF.

Figure 4

Comparison of Order Selected from Models PAR(6) to PAR(6a), Number of Autoregressive Coefficients

Figure 5

Historical × synthetic average energy inflows of the Southeast models: (a) PAR(6) and (b) PAR(6a).