Hostname: page-component-74656f9884-j7cmm Total loading time: 0 Render date: 2026-11-05T13:56:03.323Z Has data issue: false hasContentIssue false

Investigation on GEO satellite orbit determination based on CEI measurements of short baselines

Published online by Cambridge University Press:  02 May 2019

Zejun Liu*
Affiliation:
(Information Engineering University, Zhengzhou 450001, China) (Shanghai Key Laboratory of Space Navigation and Positioning Techniques, Shanghai, 200030, China) (State Key Laboratory of Geo-Information Engineering Laboratory, Xi'an 710054, China)
Lan Du
Affiliation:
(Information Engineering University, Zhengzhou 450001, China)
Yongxing Zhu
Affiliation:
(State Key Laboratory of Geo-Information Engineering Laboratory, Xi'an 710054, China)
Zhihan Qian
Affiliation:
(Shanghai Key Laboratory of Space Navigation and Positioning Techniques, Shanghai, 200030, China)
Jinqing Wang
Affiliation:
(Shanghai Key Laboratory of Space Navigation and Positioning Techniques, Shanghai, 200030, China)
Shiguang Liang
Affiliation:
(Shanghai Key Laboratory of Space Navigation and Positioning Techniques, Shanghai, 200030, China)
Rights & Permissions [Opens in a new window]

Abstract

Connected-Element Interferometry (CEI) is a technique for measuring the phase delay of difference of Time Of Arrival (TOA) of a downlink radio signal to two antennae on a short baseline. This technique can use an atomic clock for time-frequency transmission and achieve intermediate accuracy angular tracking. Owing to the relatively short length of the baseline, the passive reception mode, and near real-time operation, CEI can be used to continuously monitor the orbit variations of both cooperative and non-cooperative satellites. In this paper, a small-scale CEI system of two orthogonal baselines (75 m × 35 m) is investigated to track a Geostationary Earth Orbit (GEO) Television (TV) satellite at 110·5°E. The phases are extracted from correlation results. The results show that the Root Mean Square (RMS) of the phase fitting residuals, if not calibrated, is within 2° at night and up to 10° in the daytime. After applying the calibration signal, the RMS of the phase fitting residuals in the daytime decreases to the same level at night. Comparing the phase delay with the a priori phase delay using Two-Line-Element (TLE) data, the integer ambiguity is successfully resolved. Finally, a batch algorithm is used to estimate the orbit of the GEO satellite, and the orbit determination accuracy is evaluated using the precise orbits provided by the China National Time Service Centre (NTSC). The results show that the accuracies in the radial direction and the cross-track direction are less than 1 km, and the Three-Dimensional (3D) position accuracy reaches the 2 km order of magnitude.

Information

Type
Research Article
Copyright
Copyright © The Royal Institute of Navigation 2019 
Figure 0

Figure 1. Schematic diagram of CEI operating principle.

Figure 1

Figure 2. Block diagram of CEI experimental system.

Figure 2

Figure 3. C band receiving antenna.

Figure 3

Figure 4. Indoor equipment.

Figure 4

Figure 5. Antennae and CEI baselines (75 m × 35 m).

Figure 5

Figure 6. Phase variation of the antenna 1–2 baseline in the daytime (before calibration Root Mean Square (RMS): 7·787 (left), after calibration RMS: 1·218 (right)).

Figure 6

Figure 7. Phase variation of the antenna 1–2 baseline at night (before calibration RMS: 1·277 (left), after calibration RMS: 0·7745 (right)).

Figure 7

Figure 8. Phase variation of the antenna 2–3 baseline in the daytime (before calibration RMS: 2·892 (left), after calibration RMS: 0·744 (right)).

Figure 8

Figure 9. Phase variation of the antenna 2–3 baseline at night (before calibration RMS: 1·150 (left), after calibration RMS: 0·5472 (right)).

Figure 9

Figure 10. Phase variation of satellite signal.

Figure 10

Figure 11. Phase variation of calibration signal.

Figure 11

Figure 12. Phase variation of satellite signal after calibration.

Figure 12

Figure 13. Problem of phase ambiguity.

Figure 13

Figure 14. Ambiguity resolved phase delay for the antenna 1–2 baseline.

Figure 14

Figure 15. Ambiguity resolved phase delay for the antenna 2–3 baseline.

Figure 15

Figure 16. Residuals of phase delay of the two baselines.

Figure 16

Figure 17. The observation residual after orbit determination for 24 h.

Figure 17

Figure 18. Orbital differences between POD using CEI data and the precise ephemeris.

Figure 18

Table 1. RMS of differences between POD and the precise ephemeris

Figure 19

Figure 19. RMS of differences between POD and the precise ephemeris.