A new leak-tight borehole casing at Dome Concordia station, Antarctica, for the SUBGLACIOR project

Published online by Cambridge University Press:  26 July 2017

Romain Duphil
Affiliation:
Laboratoire de Glaciologie et Géophysique de l’Environnement (LGGE), Université Grenoble Alpes and Centre National de la Recherche Scientifique (CNRS), Grenoble, France E-mail: duphil@lgge.obs.ujf-grenoble.fr
Philippe Possenti
Affiliation:
Laboratoire de Glaciologie et Géophysique de l’Environnement (LGGE), Université Grenoble Alpes and Centre National de la Recherche Scientifique (CNRS), Grenoble, France E-mail: duphil@lgge.obs.ujf-grenoble.fr
Luc Piard
Affiliation:
Laboratoire de Glaciologie et Géophysique de l’Environnement (LGGE), Université Grenoble Alpes and Centre National de la Recherche Scientifique (CNRS), Grenoble, France E-mail: duphil@lgge.obs.ujf-grenoble.fr
Rights & Permissions [Opens in a new window]

Abstract

In the frame of the SUBGLACIOR project, a new type of casing has been installed for testing during the 2013/14 austral summer season at Dome Concordia station, Antarctica. The SUBGLACIOR probe requires a full fluid column up to the surface, in order to circulate fluid for ice-chips recovery. This makes it essential that the casing is leak-tight through the porous firn column. We have evaluated existing solutions before opting to test a new method. This new system is made of polyethylene pipes which are welded together at the surface while the casing pipes are lowered into the reamed borehole. It is simple and lightweight and allows the casing to be installed quickly with optimum chance of being leak-tight. The installed casing has been tested both with compressed air and drilling fluids and has proven to work.

Keywords

Information

Type
Research Article
Creative Commons
Creative Common License - CCCreative Common License - BY
Copyright © The Author(s) 2014 This is an Open Access article, distributed under the terms of the Creative Commons Attribution license. (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted re-use, distribution, and reproduction in any medium, provided the original work is properly cited.
Copyright
Copyright © International Glaciological Society 2014
Figure 0

Fig. 1.Anti-torque blade.

Figure 1

Fig. 2.Soldering system.

Figure 2

Table 1.Technical specifications of the welding system

Figure 3

Fig. 3.Pipe-welding process. 1 : set up the pipes; 2: face the front side of the pipes with the trimmer; 3: place the heating element between the two pipes, bring the pipe ends together and keep the pressure on the pipe during the heating (pressure and duration of heating depend on the pipe size and material); 4: release the pressure and remove the heating element; 5: move the pipe ends together again and maintain pressure during the cooling period.

Figure 4

Fig. 4.Reaming head.

Figure 5

Fig. 5.Reamer.

Figure 6

Fig. 6.Polyethylene cap for testing.