Hostname: page-component-74656f9884-2dmjx Total loading time: 0 Render date: 2026-11-07T09:13:24.681Z Has data issue: false hasContentIssue false

The construction of the claims reserve distribution by means of a semi-Markov backward simulation model

Published online by Cambridge University Press:  09 December 2011

Rights & Permissions [Opens in a new window]

Abstract

The claims reserving problem is currently one of the most debated in actuarial literature. The high level of interest in this topic is due to the fact that Solvency II rules will come into operation in 2014. Indeed, it is expected that quantile computations will be compulsory in the evaluation of company risk and for this reason we think that the construction of the claims reserve random variable distribution assumes a fundamental relevance.

The aim of this paper is to present a method for constructing the claims reserve distribution which can take into account IBNyR (Issued But Not yet Reported) claims in a natural way. The construction of the distribution function for each time of the observed interval is done by means of a Monte Carlo simulation model applied on a backward time semi-Markov process. It should be pointed out that this is the first time that a simulation model based on semi-Markov with backward recurrence time has been presented. The method is totally different from the models given in the current literature.

The most important features given in the paper are:

1) for the first time the Monte Carlo simulation method is applied to a backward semi-Markov environment;

2) the Monte Carlo simulation permits the construction of the random variable of the claims reserve for each year of the studied horizon in a natural way;

3) as already pointed out, the backward process attached to the semi-Markov process permits taking into account the evaluation of the IBNyR claims in a natural way.

In the last part of the paper an applicative example constructed from tables that summarise 4 years of claims from an important Italian insurance company will be given.

Information

Type
Papers
Copyright
Copyright © Institute and Faculty of Actuaries 2011
Figure 0

Figure 1 HSMP with backward time trajectory

Figure 1

Table 1 Value of the vectors )(--><$>{\pre}^{0}{{{\bf {{C}}}}_{i,{{k}_s}}}<$><$>{\pre}^{0}{{{\bf {{N}}}}_{i,{{k}_s}}}<$>

Figure 2

Table 2 Value of the vectors )(--><$>{\pre}^{0}{{{\bf {{C}}}}_{i,{{k}_s}}}<$><$>{\pre}^{0}{{{\bf {{N}}}}_{i,{{k}_s}}}<$>

Figure 3

Figure 2.1 Example of trajectory that ends just at the end of horizon time

Figure 4

Figure 2.2 Example of trajectory with backward time 1 that ends before the end of horizon time

Figure 5

Table 3.1 Value of the vectors )(--><$>{\pre}^{3}{{{\bf {{C}}}}_{i,{{k}_s}}}<$><$>{\pre}^{3}{{{\bf {{N}}}}_{i,{{k}_s}}}<$>

Figure 6

Table 3.2 Value of the vectors )(--><$>{\pre}^{3}{{{\bf {{C}}}}_{i,{{k}_s}}}<$><$>{\pre}^{3}{{{\bf {{N}}}}_{i,{{k}_s}}}<$>

Figure 7

Table 3.3 Value of the vectors )(--><$>{\pre}^{3}{{{\bf {{C}}}}_{i,{{k}_s}}}<$><$>{\pre}^{3}{{{\bf {{N}}}}_{i,{{k}_s}}}<$>

Figure 8

Figure 3 Graphs of Table 7 with SCR and MCR

Figure 9

Table 4 Merging of all the elements of the Table 3.3. done on the columns (state i and backward 3)

Figure 10

Table 5 r.v. of all possible unitary costs, the distribution probability is obtained dividing each occurrence by the total number of occurrences

Figure 11

Table 6 r.v. of costs of each value obtained multiplying the values for the corresponding occurrences

Figure 12

Table 7 Increasing total cost and its distribution function

Figure 13

Figure 4 The Markov chain graph of the claims stages

Figure 14

Table 8 Supposed claims number for each state and backward time

Figure 15

Figure 5 Markov Chain embedded in the SMP

Figure 16

Figure 6 Waiting time d.f. with starting states IBNR and OC

Figure 17

Figure 7.1 Evolution equation solution at time 5 with backward time 1

Figure 18

Figure 7.2 Evolution equation solution at time 5 with backward time 5

Figure 19

Figure 8.1 Total costs that come from the open claim starting stage

Figure 20

Figure 8.2 Total costs that come from the IBNyR claim starting stage

Figure 21

Figure 9.1 Total costs that come from the reported claims in the year 1

Figure 22

Figure 9.2 Total costs that come from the reported claims in the year 5 with the related D.F.

Figure 23

Figure 10 Total numbers and unitary costs of accidents in the 12 years

Figure 24

Figure 11 Unitary costs with the related distribution function

Figure 25

Figure 12 Total cost and the related distribution function with SCR and MCR calculation