Hostname: page-component-7b7567c8c-tnzcf Total loading time: 0 Render date: 2026-11-13T22:05:46.688Z Has data issue: false hasContentIssue false

Buildings for Dollars and Oil: East German and Romanian Construction Companies in Cold War Iraq

Published online by Cambridge University Press:  18 August 2021

Łukasz Stanek*
Affiliation:
Manchester Architecture Research Group, School of Environment, Education & Development, Room 1.12, Humanities Building, The University of Manchester, Oxford Road, M139PL Manchester, UK
Rights & Permissions [Opens in a new window]

Abstract

This article discusses the partial integration of companies from socialist Eastern Europe into the nascent economic globalisation in the late Cold War. By focusing on the industrial slaughterhouse designed and built in Baghdad by East German and Romanian companies (1974–81), it shows how they operated within and across the political economy of state socialism and the emerging, Western-dominated market of construction services. In Baghdad, East Germans and Romanians struggled with working across differing monetary regimes, inefficient corporate structures and the requirement to comply with Western standards and regulations. This article shows how they strived to bypass obstacles and to exploit opportunities stemming from their liminal and unequal position in Iraq. By zooming into architectural and engineering documentation, it argues that petrobarter agreements, or the exchange of crude oil for goods and services, shaped programmes, layouts, technologies and materialities of buildings constructed by Eastern Europeans in Iraq and the region.

Information

Type
Article
Creative Commons
Creative Common License - CCCreative Common License - BY
This is an Open Access article, distributed under the terms of the Creative Commons Attribution licence (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted re-use, distribution, and reproduction in any medium, provided the original work is properly cited.
Copyright
Copyright © The Author(s), 2021. Published by Cambridge University Press
Figure 0

Figure 1.Modern slaughterhouse Baghdad, model. Ipro-Dessau (German Democratic Republic). ‘VEB Industrieprojektierung Dessau: Betriebschronik’, vol. 2, n.d.

Figure 1

Figure 2.Location of the slaughterhouse in Baghdad. Drawn by the author, on the basis of a schematic map of Baghdad (1975), issued by the Summer Resorts and Tourism Service (Iraq). Library of Congress, Washington DC (USA), G7614.B3 1975.D6.

Figure 2

Figure 3.Advertisement of the Romanian contractor Arcom, in charge of the construction of the Baghdad slaughterhouse. Published in the daily newspaper Baghdad Observer (Iraq), September 17, 1976, 2.

Figure 3

Figure 4.The canteen building after completion at the Baghdad slaughterhouse compound. Ipro-Dessau (German Democratic Republic). ‘VEB Industrieprojektierung Dessau: Betriebschronik’, vol. 2, n.d.

Figure 4

Figure 5.Diagram showing the development process of a design offer for export, 1984. Romproiect (Romania). Arhivele Naționale (Bucharest), f. Romproiect, 7099.

Figure 5

Figure 6.Design of the canteen on the Baghdad slaughterhouse compound, facades. ‘Cantina abatorului din Baghdad’, Arhitectura (Bucharest), 6 (1984), 80.

Figure 6

Figure 7.Primary school in al-Qaim, Iraq, 1982. Arcom, ICPMC (Romania). Arhivele Naționale (Bucharest), f. Romproiect, 7256.

Figure 7

Figure 8.Master plan for a neighborhood in Mosul, Iraq, 3500 dwellings, 1983. Arcom, Romproiect (Romania). Arhivele Naționale (Bucharest), f. Romproiect, 7257.

Supplementary material: File

Stanek supplementary material

Stanek supplementary material

Download Stanek supplementary material(File)
File 14.7 KB