Hostname: page-component-6898cfcb55-zkb6p Total loading time: 0 Render date: 2026-11-11T22:09:26.875Z Has data issue: false hasContentIssue false

The investigation and experience of using ESTISOL™ 240 and COASOL™ for ice-core drilling

Published online by Cambridge University Press:  26 July 2017

Simon G. Sheldon
Affiliation:
Centre for Ice and Climate, Niels Bohr Institute, University of Copenhagen, Copenhagen, Denmark E-mail: sheldon@nbi.ku.dk
Jørgen P. Steffensen
Affiliation:
Centre for Ice and Climate, Niels Bohr Institute, University of Copenhagen, Copenhagen, Denmark E-mail: sheldon@nbi.ku.dk
Steffen B. Hansen
Affiliation:
Centre for Ice and Climate, Niels Bohr Institute, University of Copenhagen, Copenhagen, Denmark E-mail: sheldon@nbi.ku.dk
Trevor J. Popp
Affiliation:
Centre for Ice and Climate, Niels Bohr Institute, University of Copenhagen, Copenhagen, Denmark E-mail: sheldon@nbi.ku.dk
Sigfús J. Johnsen
Affiliation:
Centre for Ice and Climate, Niels Bohr Institute, University of Copenhagen, Copenhagen, Denmark E-mail: sheldon@nbi.ku.dk
Rights & Permissions [Opens in a new window]

Abstract

Continuous good-quality deep ice cores provide excellent scientific data with which to reconstruct a past climate record for >800 ka. At depths starting from ∼100m using an electromechanical drill, a drilling liquid is essential for successful recovery of the very high-quality ice cores demanded by modern scientific analysis techniques (e.g. continuous flow analysis). Finding a suitable drill fluid for use at deep ice-coring drill sites is not an easy task. Temperatures vary greatly not just from site to site, but also at a site where the average mean temperature from surface to bedrock can vary from –55°C to –2.75°C. In the past 60 years, many fluids have been used, with varying degrees of success, but for various reasons are either unavailable, are now considered unsafe and dangerous or are too environmentally damaging to be permitted. Here we report on our pre-season investigation into possible candidate drill fluids, with specific information concerning ESTISOL™ 240 and COASOL™, the rationale behind the redesign of our drill successfully used at NorthGRIP, Greenland, and EPICA DML, Antarctica, the knock-on effect of those changes, and our field experience in Greenland at Flade Isblink in 2006 and at NEEM in 2009–10.

Information

Type
Research Article
Copyright
Copyright © International Glaciological Society 2014
Figure 0

Table 1.List and comparison of ice-core drilling fluids. Undesirable attributes are shown in boldface

Figure 1

Fig. 1.Density temperature measurements of candidate drill fluids and mixtures. The central green band represents the desirable density, and the upper and lower red areas are undesirable densities. The volumes of mixtures are at 20°C.

Figure 2

Fig. 2.Kinematic viscosity measurements for several test candidate drill fluids. The lower green area represents desirable attributes according to Gundestrup and others (1994), and the upper red undesirable attributes. ESTISOL 170, Lusolvan FBH, ESTISOL 256 and EDGA were initially considered and tested. They were found to be less suitable. ESTISOL 170 ‘froze’ at –30°C; ESTISOL 256 has similar density characteristics to ESTISOL 240, but with a higher viscosity. EDGA was found to be very aggressive to plastics. Lusolvan FBH has high viscosity. The volumes of mixtures are at 20°C.

Figure 3

Fig. 3.Ice granules mixed with ESTISOL™ 240/COASOL™ at –25°C.

Figure 4

Table 2.Materials with no noticeable effects, and with noticeable effects, after contact with ESTISOL 240™ or COASOL™

Figure 5

Fig. 4.Nitrile rubber O-rings used within the ice-core drill

Figure 6

Table 3.Comparison of measured and calculated maximum drill descent velocities (terminal velocity) at NorthGRIP and EPICA Dome C

Figure 7

Fig. 5.Measured and calculated maximum descent velocities (terminal velocity) of drills used at EPICA Dome C and NorthGRIP. Terminal velocities were measured at (i) actual velocity achieved at EPICA Dome C in 2004, in Exxsol™ D30 and HCFC-141b with the EPICA Dome C drill at −30°C, depth ∼1950 m; (iii) NorthGRIP II in 2003 and 2004 in Exxsol™ D60 and HCFC-141b with the NorthGRIP drill at −30°C, depth ∼1850m. The terminal velocity was calculated for (ii) EPICA Dome C drill in Exxsol™ D30 and HCFC-141b at 0°C to −40°C; (iv) NorthGRIP drill in Exxsol™ D60 and HCFC-141b at 0°C to –40°C; and (v) NorthGRIP drill in ESTISOL™ 240 (78% vol.)/COASOL™ (22% vol.) mixture at 0°C to –40°C.

Figure 8

Fig. 6.Comparison of maximum measured and calculated descent velocities (terminal velocities) of the Hans Tausen (HT) drill in borehole diameters 126.0, 129.6 and 134mm in pure ESTISOL™ 240 at Flade Isblink. (i) Measured terminal velocities of HT drill in 126.0 mm diameter borehole in ESTISOL™ 240 at –15.7°C with a kinematic viscosity of 13.5 mm2 s−1; (ii) calculated terminal velocity of HT drill in 126.0 mm diameter borehole in ESTISOL™ 240 in the range –30°C to 0°C; (iii) measured terminal velocities of HT drill in 129.6 mm diameter borehole in ESTISOL™ 240 at –15.7°C with a kinematic viscosity of 13.5 mm2 s−1; (iv) calculated terminal velocity of HT drill in 129.6 mm diameter borehole in ESTISOL™ 240 in the range –30°C to 0°C; (v) measured terminal velocities of HT drill in 134 mm diameter borehole in ESTISOL™ 240 at –15.7°C with a kinematic viscosity of 13.5 mm2 s−1; and (vi) calculated terminal velocity of HT drill in 134 mm diameter borehole in ESTISOL™ 240 in the range –30°C to 0°C.

Figure 9

Fig. 7.Comparison of maximum drill descent speeds (terminal velocities) for various measured and calculated drill configurations, types of drill fluid and temperatures. Terminal velocities were measured at (i) EPICA Dome C in Exxsol™ D30 and HCFC-141b with the EPICA Dome C drill at -30°C, depth ∼1950 m; (iii) NorthGRIP II in Exxsol™ D60 and HCFC-141b with the NorthGRIP drill at −30°C, depth ∼1850 m. The terminal velocity was calculated for (ii) EPICA Dome C drill in Exxsol™ D30 and HCFC-141b at 0°C to −50°C; (iv) NorthGRIP drill in Exxsol™ D60 and HCFC-141b at 0°C to −50°C; (v) NorthGRIP drill in ESTISOL™ 240 (78% vol.)/COASOL™ (22% vol.) mixture at 0°C to −40°C; (vi) NorthGRIP drill configured with enlarged cutters for 132 mm diameter borehole and 2 m longer chip chamber in ESTISOL™ 240 (78% vol.)/COASOL™ (22% vol.) mixture at 0°C to –40°C; (vii) NorthGRIP drill configured with enlarged cutters for 134 mm diameter borehole and 2 m longer chip chamber in ESTISOL™ 240 (78% vol.)/COASOL™ (22% vol.) mixture at 0°C to –40°C. Due to the larger borehole diameter, extra chips would be produced for the same length of ice core recovered. This required a larger chip chamber volume. This increase in chip volume increased the overall length of the drill by 2 m. This increase in drill length would have a knock-on reduction in the descent velocity.

Figure 10

Fig. 8.Assuming the new drill site NEEM has an ice temperature depth profile similar to NorthGRIP and GRIP over the predicted ice depth of 2550 m, we calculated the terminal velocity of the drill for several drill configurations. The terminal velocity was calculated for (i) NorthGRIP drill in ESTISOL™ 240 (78% vol.)/COASOL™ (22% vol.) mixture; (ii) NorthGRIP drill in Exxsol™ D60 and HCFC-141b; (iii) NorthGRIP drill configured with enlarged cutters for 132 mm diameter borehole in ESTISOL™ 240 (78% vol.)/COASOL™ (22% vol.) mixture; (iv) NorthGRIP drill configured with enlarged cutters for 132 mm diameter borehole and 2 m longer chip chamber in ESTISOL™ 240 (78% vol.)/COASOL™ (22% vol.) mixture. (v) A simplified temperature profile based on NorthGRIP, but assuming 2°C warmer and no basal melting.

Figure 11

Fig. 9.Assuming the new drill site NEEM has an ice temperature depth profile similar to NorthGRIP and GRIP over the predicted ice depth of 2550 m, we calculated the terminal velocity of the drill for several drill configurations. The predicted time taken per run for (i) NorthGRIP drill in ESTISOL™ 240 (78% vol.)/COASOL™ (22% vol.) mixture; (ii) NorthGRIP drill in Exxsol™ D60 and HCFC-141b; (iii) NorthGRIP drill configured with enlarged cutters for 132mm diameter borehole in ESTISOL™ 240 (78% vol.)/COASOL™ (22% vol.) mixture; (iv) NorthGRIP drill configured with enlarged cutters for 132mm diameter borehole and 2 m longer chip chamber in ESTISOL™ 240 (78% vol.)/COASOL™ (22% vol.) mixture. (v) A simplified temperature profile based on NorthGRIP, but assuming 2°C warmer and no basal melting.

Figure 12

Fig. 10.The estimated effects of the drilling configuration on the number of seasons required to complete the project. The 2008 season is assumed to be consumed by drilling the firn and adding the casing. The fluid phase drilling starts in 2009. The estimated completion at 2550 m is in 2010 or 2011 depending on the configuration. The predicted project time for (i) NorthGRIP drill in ESTISOL™ 240 (78% vol.)/COASOL™ (22% vol.) mixture; (ii) NorthGRIP drill in Exxsol™ D60 and HCFC-141b; (iii) NorthGRIP drill configured with enlarged cutters for 132 mm diameter borehole in ESTISOL™ 240 (78% vol.)/COASOL™ (22% vol.) mixture; (iv) NorthGRIP drill configured with enlarged cutters for 132 mm diameter borehole and 2 m longer chip chamber in ESTISOL™ 240 (78% vol.)/COASOL™ (22% vol.) mixture.

Figure 13

Fig. 11.Comparison of the actual and estimated effects of the drilling configuration with the actual drilling progress. (i) Estimate using NorthGRIP drill configured with enlarged cutters for 132 mm diameter borehole and 2 m longer chip chamber in ESTISOL™ 240 (78% vol.)/COASOL™ (22% vol.) mixture. (ii) Actual progress during NEEM drilling.

Figure 14

Fig. 12.At both NorthGRIP and Dome C, problems associated with ‘warm’-ice drilling were encountered at ∼–10°C, ∼7.6°C below the pressure-melting temperature. At the NEEM site at 2537 m, where the ice temperature was −3.4°C, no warm-ice problems were encountered even though the ice was only 0.9°C below the estimated ice pressure-melting temperature. We concluded that the differences in depth, and hence the pressure-melting temperature, did not influence the improved drilling performance at NEEM.

Figure 15

Fig. 13.NEEM borehole diameter vs depth for 2011 and 2012.

Figure 16

Table 4.The difference in borehole diameter from 2011 to 2012 in several discrete sections