Hostname: page-component-74656f9884-skzmx Total loading time: 0 Render date: 2026-11-06T08:13:21.047Z Has data issue: false hasContentIssue false

Modelling liquefied natural gas ship traffic in port based on cellular automaton and multi-agent system

Published online by Cambridge University Press:  09 March 2021

Jingxian Liu
Affiliation:
School of Navigation, Wuhan University of Technology, Wuhan, China. Hubei Key Laboratory of Inland Shipping Technology, Wuhan, China
Yang Liu
Affiliation:
School of Navigation, Wuhan University of Technology, Wuhan, China. Hubei Key Laboratory of Inland Shipping Technology, Wuhan, China
Le Qi*
Affiliation:
School of Navigation, Wuhan University of Technology, Wuhan, China. Hubei Key Laboratory of Inland Shipping Technology, Wuhan, China
*
*Corresponding author. E-mail: leqiem@hotmail.com
Rights & Permissions [Opens in a new window]

Abstract

Over the past few decades, the number of liquefied natural gas (LNG) ships and terminals has been increasing, playing an important role in global clean energy transportation. However, the traffic capacity of LNG shipping in port areas is limited because of its high safety requirements. In view of this problem, a novel model is proposed to study the ship traffic in a port area by combining cellular automaton (CA) and multi-agent methods. Taking the CNOOC Tianjin LNG Terminal as an example, the ship traffic in Tianjin Port is simulated. Based on the simulation results, the LNG ship traffic capacity and its impact on the general shipping traffic flow under different special traffic rules are obtained. This model can provide theoretical support for optimising the port traffic organisation for LNG ships.

Information

Type
Research Article
Copyright
Copyright © The Royal Institute of Navigation 2021
Figure 0

Figure 1. Framework of ship traffic modelling in port based on CA and multi-agent

Figure 1

Figure 2. Simulation model running process

Figure 2

Figure 3. Channel discrete range

Figure 3

Figure 4. Process of LNG ship entering the port

Figure 4

Figure 5. Process of LNG ship departure

Figure 5

Figure 6. Ship type distribution in December 2017

Figure 6

Figure 7. Ship length distribution in December 2017

Figure 7

Figure 8. Speed distribution: (a) incoming speed; (b) departure speed

Figure 8

Figure 9. Interval distribution: (a) ship arrival time distribution; (b) ship departure time distribution

Figure 9

Table 1. LNG ship scale

Figure 10

Figure 10. Time and space diagram of all ships:(a) simulation result when plan A is adopted; (b) simulation result when plan B is adopted; (c) simulation result when plan A is adopted

Figure 11

Figure 11. Time and space diagram of LNG ships: (a) simulation result when plan A is adopted; (b) simulation result when plan B is adopted; (c) simulation result when plan A is adopted

Figure 12

Figure 12. Arriving LNG ships and completed entry and departure of LNG ships:(a) simulation result when plan A is adopted; (b) simulation result when plan B is adopted; (c) simulation result when plan C is adopted

Figure 13

Figure 13. Time and space diagram of all ships: (a) simulation result when plan A is adopted; (b) simulation result when plan B is adopted; (c) simulation result when plan C is adopted

Figure 14

Figure 14. Time and space diagram of LNG ships: (a) simulation result when plan A is adopted; (b) simulation result when plan B is adopted; (c) simulation result when plan C is adopted

Figure 15

Figure 15. Arriving LNG ships and completed entry and departure LNG ships:(a) result when plan A is adopted; (b) result when plan B is adopted; (c) result when plan C is adopted

Figure 16

Figure 16. Simulation results

Figure 17

Table 2. Ship latency time when plan A is adopted (1 LNG berth)

Figure 18

Table 3. Ship latency time when plan B is adopted (1 LNG berth)

Figure 19

Table 4. Ship latency time when plan C is adopted (1 LNG berth)

Figure 20

Table 5. Ship latency time when plan A is adopted (2 LNG berth)

Figure 21

Table 6. Ship latency time when plan B is adopted (2 LNG berth)

Figure 22

Table 7. Ship latency time when plan C is adopted (2 LNG berth)