Special aspects of ice drilling and results of 5G hole drilling at Vostok station, Antarctica

Published online by Cambridge University Press:  26 July 2017

V.S. Litvinenko
Affiliation:
National Mineral Resources University, St Petersburg, Russia E-mail: vasilev_n@mail.ru
N.I. Vasiliev
Affiliation:
National Mineral Resources University, St Petersburg, Russia E-mail: vasilev_n@mail.ru
V.Ya. Lipenkov
Affiliation:
Arctic and Antarctic Research Institute, St Petersburg, Russia
A.N. Dmitriev
Affiliation:
National Mineral Resources University, St Petersburg, Russia E-mail: vasilev_n@mail.ru
A.V. Podoliak
Affiliation:
National Mineral Resources University, St Petersburg, Russia E-mail: vasilev_n@mail.ru
Rights & Permissions [Opens in a new window]

Abstract

This paper documents the drilling of the 5G deep hole at the Russian Vostok station, Antarctica. The hole construction is described and the specifications of the drill and surface drilling equipment are given. The peculiarities of drilling at various depths are considered. Based on the extensive experimental data collected at Vostok station, the processes occurring at the hole bottom are investigated: ice breaking and cutting, bottom cleaning and chip transport, and accumulation of the chips in the screen. The main factors affecting ice-drilling efficiency are the coarseness of ice crystals and the ice temperature. When ice crystal size exceeds 10 mm the cutting efficiency sharply decreases, and when ice temperature exceeds –5°C the chip transport from the hole bottom and the chip density in the screen are reduced. The drill advance then becomes irregular, slows down and may even be terminated in some cases. Optimal values of the basic drilling parameters (e.g. cutter head rotation rate and drilling fluid flow rate in the circulation system) have been deduced empirically. The designs of the cutter head and circulation system including screens have been significantly modified, allowing the drilling process to proceed at a normal rate even in the vicinity of the subglacial lake surface.

Information

Type
Research Article
Copyright
Copyright © International Glaciological Society 2014
Figure 0

Fig. 1.5G hole diagram: a. vertical section; b. hole structure.

Figure 1

Fig. 2.Drilling complex at Vostok station: 1. shelter; 2. drilling mast; 3. drill winch; 4. carrying cable; 5. control panel; 6. drill; 7. device for drill assembly mounting; 8. d.c. generator; 9. main transmission of winch; 10. transmission of uniform feed; 11. upper roller; 12. lower roller; 13. geophysical winch.

Figure 2

Table 1.Specifications of the drilling complex

Figure 3

Fig. 3.Scheme of electromechanical coring drill KEMS-132. 1. head; 2. core barrel; 3. ice chip chamber; 4. reducer; 5. power motor; 6. pump; 7. anti-torque; 8. hammer unit; 9. current collector; 10. cable end; 11. carrying cable.

Figure 4

Table 2.Specifications of the drill assembly KEMS-132

Figure 5

Fig. 4.Results of electromechanical drilling of 5G-1 hole at Vostok station. Curve 1 : penetration per drilling run; curve 2: ice crystal size (Lipenkov and others, 2007). Depth intervals drilled during different RAEs are indicated at the top.

Figure 6

Fig. 5.Retrofit cutter head adjusted for ‘warm’ coarse crystalline ice drilling: 1. head body; 2. blades (a, b, c: blade modifications); 3. axe of core-cutter trigger; 4. core-cutter trigger; 5. prong.

Figure 7

Fig. 6.Penetration per run in 5G-1, 5G-2 and 5G-3 holes. Curve 1 : penetration per drilling run in 5G-1 and 5G-2 holes (before Subglacial Lake Vostok unsealing); curve 2: penetration per run in 5G-3 hole (after the unsealing).